Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2025 at 8:00 PM
Updated August 1, 2025
Site work and paving for a road / highway in Hartford, Connecticut. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Update:Reconfiguration of Asylum Avenue between Prospect Avenue and Sumner Street, including reduced lane widths to slow speeding, a separated bike lane, new signage and safer pedestrian crossings. Project is included in City of Hartford Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Funding for road diet and bike lanes on Asylum Avenue between Prospect Ave and Sumner Street. This project was designed and underwent public engagement, as one of the priorities of the last administration. In an effort to make measurable progress towards safer streets in Hartford, the City has been working to identify modifications to the Asylum Avenue corridor. The aim of this project is to help reduce speeding through traffic calming; improve facilities for alternative modes of transportation; and allow for safer crossings. The limits of the project are from Prospect Avenue to Sumner Street, and street reconfiguration will include reduced lane widths to slow traffic, lane modification, bicycle facilities, and new signage. There are complementary transportation projects occurring along or near the corridor, including the Trident Intersection at Broad/Farmington/Asylum, the Asylum/Sigourney intersection, and the Sigourney Street Cycletrack. As of July 31 , 2024, this project is included in the city's 2025-2029 Capital Improvement Program (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$250,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Asylum Ave, Hartford, CT
Related To This Project
Hartford, CT
--
Hartford, CT
--
Hartford, CT
--
Hartford, CT
--
Hartford, CT
Bid Date: Sep 03 2025
Hartford, CT
--
Hartford, CT
Bid Date: Aug 01 2025
Hartford, CT
--
Hartford, CT
--
Hartford, CT
Bid Date: Dec 04 2025
Hartford, CT
Bid Date: Sep 04 2025
Hartford, CT
Bid Date: Sep 12 2025
Hartford, CT
Bid Date: Aug 21 2025
Hartford, CT
Bid Date: Aug 29 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
