BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint Charles, Missouri. Completed plans call for site work for a water / sewer project.

The Project work shall include the following description of the work: Cleaning and televising of previously identified sewer mains and connected laterals, Repair or replace sanitary laterals and clean outs, Project Location: St. Charles, MO Question Deadline 08/12/2024 at 3:00 PM CT Questions regarding the plans and specifications must be submitted in writing to the City of Saint Charles Department of Engineering. additional question will be addressed. Questions may be hand delivered, mailed, faxed to (636) 940-4601, or emailed to Jonathan.Swagman@stcharlescitymo.gov. Disconnect roof drains, sump pumps, and other stormwater/groundwater inflow sources. The bid shall be accompanied by a bid deposit (guaranty) for the amount equal to five percent (5%) of the total bid amount. The bid deposit may be in the form of a bid bond issued by an insurance company authorized to do business in the state of Missouri and with a financial strength rating of A with a financial size category of IX or better by A. M. Best, a certified check or a cashier's check drawn on a bank located in St. Charles County, the City of Saint Charles, St. Louis County, or the City of St. Louis. The bid deposit shall be forfeited to the City if the bidder does not execute a contract for the Project and provide all bonds, insurance requirements and other required documents by the date stated in the bid award. The successful bidder shall furnish a performance and payment bond for one hundred (100%) percent of the contract amount and shall provide certificates of insurance and insurance policy endorsements for workers' compensation, commercial general liability, auto liability, property damage and other policies of insurance as stated in the bid specifications and in the amounts stated therein for the therein stated policy periods. An additional separate guarantee performance bond in the amount of 10% of the contract amount shall be delivered at time of contract execution to guarantee satisfactory performance of the work completed for a period of two (2) years after the date of acceptance of the work. Project work shall commence work within seven (7) calendar days after the date of written notice from the City to start work and shall complete all work within 120 (one hundred and twenty) calendar days after the expiration date of the seven (7) day period. The City of Saint Charles is an equal opportunity employer and does not discriminate because of age, ancestry, color, disability, familial status, religion or sex. The City reserves the right to require the bidders to provide proof of the ability to properly finance and execute the Project together with a record of successful completion of similar projects. The City reserves the right to reject any and all bids or to advertise for new bids. The City reserves the right to defer the acceptance of any bid and the execution of a contract for up to one hundred

Bid Results

Water / Sewer

$894,142.00

Public - City

Site Work

13

5

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
858
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Saint Charles, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.