BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 11, 2026

Site work for a transportation facility in Long Beach, California. Working plans call for site work for a transportation facility.

https://www.whig.com/online_features/press_releases/jacobs-to-support-rail-expansion-for-major-la-area-port-facility/article_8a317879-e3db-5f54-ae7c-3d446c273b6d.html DALLAS, Aug. 7, 2025 /PRNewswire/ -- Jacobs (NYSE: J) has been awarded a contract to provide construction management for the Port of Long Beach's Pier B On-Dock Rail Support Facility program. This project is a cornerstone of the port's $2.2 billion program to enhance cargo movement efficiency, reduce environmental impacts and support regional economic development. _______________ https://www.hellenicshippingnews.com/long-beach-port-unveils-10-year-capital-improvement-program/ Long Beach Port Onveils 10-Year Capital Improvement Program Over the next decade, the Port of Long Beach plans to invest more than $3.2 billion in capital projects that drive efficiency and make cargo operations more sustainable. The 10-year program calls for improvements to rail, terminals, roadways, waterways, and safety and security. Also included are infrastructure projects that support the use of zero-emissions equipment. More than $1.28 billion, about 40% of the total, is expected to go toward the Pier B On-Dock Rail Support Facility. The facility is the centerpiece of all the improvements the Port has made to its rail network to date, and its goods movement and environmental benefits will reach across the San Pedro Bay ports complex and beyond. Construction began in 2024 and is due to be completed in 2032. More than $700 million, about 22% of the total, is anticipated for sewer, street, water and stormwater projects. Improvements to waterfront infrastructure are expected to total more than $476 million, about 15% of the overall program. While sustainability is a core element of all capital projects, the Port plans to spend more than $220 million on specific ZE infrastructure projects that support its goal of transitioning all cargo handling equipment to ZE models by 2030. The spending plan covers fiscal years 2026 through 2035. All infrastructure projects are subject to approval by the Long Beach Board of Harbor Commissioners. Source: Port of Long Beach --------------------------------------------------------------------------------------------- https://www.bizjournals.com/losangeles/news/2024/12/26/port-long-beach-notable-projects-2025.html Pier B On-Dock Rail Support Facility In January, the Port of Long Beach will begin phase two of its $1.6 billion Pier B On-Dock Rail Support Facility, expanding the existing Pier B rail yard and connecting it to on-dock rail facilities and the Alameda Corridor railway, which will more than double the size of the existing Pier B rail yard from 82 acres to 171 acres. Cordero said in the press briefing that phase two of the project will mark a “big milestone for 2025.” The Port of Long Beach broke ground on the project in July and expects to wrap by 2032. The enhancements to rail capacity at the Port of Long Beach’s shipping terminals will speed up deliveries across the national supply chain, easing congestion and lessening environmental impacts and allowing the port to more than triple the volume of on-dock rail cargo handled annually, from 1.5 million twenty-foot equivalent units to 4.7 million TEUs, according to the port. __________________________ Online Q&A Yes Q&A Deadline 08/19/2024 12:00 PM (PDT) Provide Professional Construction Management Services for Pier B On-Dock Rail Support Facility Program. The Program constructs an expanded on-dock rail facility, re-alignment of Pier B Street and Pico Avenue, establishes new utility corridors, and provides surge capacity for the railroads and terminals by expansion of storage tracks. The selected firm shall be responsible for performing or overseeing the duties necessary for the successful delivery of the Program, including, but not limited to: construction consultation support during the design phase; constructability reviews; partnering facilitation; claims analysis and support; document control and project controls; estimating; coordination of construction contractors; cost engineering support; grant monitoring; SWPPP compliance; environmental regulatory support; utility coordination and tracking; or other services as required. Other Details Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00%

Final Planning

Transportation Terminals

$21,730,000.00

Public - City

Site Work

190

20

14

7

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
25
Bidding Soon
2,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

May 29, 2026

Project location map

Multiple Locations, Long Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.