BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2024 at 8:00 PM

Updated September 7, 2024

Site work for a power facility in Fleming, Colorado. Completed plans call for site work for a power facility.

Any questions concerning this solicitation MUST be submitted in writing and received in the contracting office NO LATER THAN 1600 Mountain Time on 12 Aug 2024. Questions received after this date may or may not be addressed, at the discretion of the Contracting Officer. Questions may be sent via facsimile at N/A or to the following email address magbitangwapa.gov AND jprattwapa.gov. The Department of Energy, Western Area Power Administration (WAPA), invites you to submit a bid for FLEMING SUBSTATION, STAGE 03, under Invitation for Bids (IFB) 89503224BWA000064. This solicitation is issued as a 100% Small Business Set-Aside. The NAICS code is 237130 and the applicable size standard is $45 Million. The estimated order of magnitude for this acquisition is between $250,000 and $500,000. This letter is not an integral part of the IFB, which is a self-contained standalone document. In the event of any conflict between the contents of this letter and the enclosed IFB, the IFB language shall prevail. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: 1. The principal components of work include: a. b. c. d. e. Install one (1) government furnished pad-mounted 1 MVA 12.47kV/2.4kV transformer (KW5A) to serve as the primary service line for the Town of Fleming. Furnish and install the following: (1) (2) (3) (4) Primary side fuse disconnect switch FW5A (521) for KW5A Secondary side disconnect switch WW5B (523) for KW5A Secondary side disconnect switch WW4C (325) for KW4A Secondary side disconnect switch XW3A (129) for KY1A Provide concrete foundations for KW5A and WW5B. Furnish and install: Steel beam Conduit support Equipment Bus Support Switch Operating Platform Furnish and install rigid bus, jumpers, grounding, and conduit for a complete installation of the electrical components.

Post-Bid

Power Plant

$500,000.00

Public - Federal

Site Work

27

13

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
52
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

Project location map

To Be Determined, Fleming, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.