BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work and paving for a mixed-use development in Auburn, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

New sidewalk including curb (granite and hma berm), fountain upgrades and installation of new prefabricated 90' long pedestrian bridge (provided by others) at Goddard Park. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work includes installation of new hot mix asphalt and concrete walk, granite curb, new steel pedestrian bridge over Ramshorn Brook (provided by others), utility vault upgrades, misting pool upgrades, relocating existing benches, new ADA pedestrian ramps, new signage and pavement markings, and other incidental work as shown on the plans and as described herein. All requests for information regarding this bid package must be made via e-mail to the attention of William G. Paille, PE, Project Manager, wpaille@bscgroup.com and must be received by 12:00 pm on Friday, August 16, 2024 to provide a minimum of 3 business days to provide a response and bidders adequate time to make any adjustments to their bid.

Bid Results

Bridges / Tunnels

$658,303.00

Public - City

Paving, Site Work

23

9

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
660
Active Projects
291
Bidding Soon
4,442
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

September 23, 2024

Project location map

341357 Southbridge St, Auburn, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.