BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a road / highway in Vernon, British Columbia. Completed plans call for site work for a road / highway.

The implementation of a 3.0-metre-wide multi-use path (MUP) on 46th Avenue between 20th Street and Pleasant Valley Road, the extension of the existing 4.0-metre-wide MUP on Pleasant Valley Road to 46th Avenue, and the reconstruction of 46th Avenue. The scope of work includes: Approximately 400m of asphalt multi-use pathway (MUP) on Pleasant Valley Road and 46th Avenue New concrete curb and gutter on both sides of 46 Ave between 20th Street and Pleasant Valley Road repaving on 46th Avenue between 20th Street and Pleasant Valley Road New concrete curb and gutter with infill paving on the east side of Pleasant Valley Road, north of 20th Street Additional road and utility improvements related to the MUP on Pleasant Valley Road and 46th Avenue. Documents can be obtained from https://vernon.bonfirehub.ca/opportunities/82904

Award

Roads / Highways

$836,532.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
7
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 1, 2024

Project location map

Pleasant Valley Rd & 46 Ave, Vernon, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.