BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2024 at 8:00 PM

Updated August 17, 2024

Site work and paving for a road / highway in Birchwood, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Placement of 3" of Base, Full Depth Pulverize and Relay, 3" of Asphaltic Surface, and Shouldering. Requesting Bids for Placement of 3" of Base, Full Depth Pulverize and Relay, 3" of Asphaltic Surface, and Shouldering of Old Hayes Road From the Knutson Creek Bridge on East Shore Drive Approximately 1.6 Miles and Cedar Avenue From the County Line to Cth F .9 Miles. Gravel Base Will Be Supplied From the Township Pit. Work to Be Completed by October 1, 2025 the Town of Edgewater Reserves the Right to Accept or Reject Any or All Bids.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
48
Bidding Soon
685
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

October 16, 2024

Project location map

Multiple Locations, Birchwood, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.