EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Edwards, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

8001-44 (TH 10=002), 5605-24 (TH 10=002), SAP 056-692-007, SAP 080-654-003, SAP 080-594-005 8003-37 (TH 71=184), 8004-41 (TH 71=4), 8002-09 (TH 29=184), S.A.P. 080-656-001 NHPP-CRP-STBG 0010(343) In Otter Tail and Wadena Counties on TH 10 from 1100 Feet West of 620th Ave to 2520 Feet East of Oink Joint Road and on TH 71 from Franklin Ave to 350 Feet South of TH 10, TH 71 from 200 Feet North of TH 10 to 0.4 Miles North of Alfred Street and on TH 29 from Otter Tail/Wadena County Line to TH 71 Grading, Roundabout, Bituminous and Concrete Surfacing, ADA Improvements, Structural Snow Fence, Signing, Signal, Lighting and Box Culverts; Grading, Bituminous Mill & Surfacing, ADA Improvements, and Signals 8.843 Miles Site Directions: In Otter Tail and Wadena Counties on TH 10 from 1100 Feet West of 620th Ave to 2520 Feet East of Oink Joint Road and on TH 71 from Franklin Ave to 350 Feet South of TH 10, TH 71 from 200 Feet North of TH 10 to 0.4 Miles North of Alfred Street and on TH 29 from Otter Tail/Wadena County Line to TH 71 County Name: Multiple 12% Min. 9% Women DBE 10.10 Start 5/15/25 End 5/28/28 MNDOT - 027 - Grading, Roundabout, Bituminous and Concrete Surfacing, ADA Improvements - Multiple Locations This Work consists of using automated machine guidance (AMG) to continually monitor and record Muck Excavation operations for use in creating the As-Built Muck Excavation Surface Model (Digital Surface Model) used in quantification of Excavated Volumes (MnDOT 1901.5.A). This Work consists of capturing As-built Asset Features in standard Asset Class deliverable formats. This Work consists of using automated machine guidance (AMG) to control the construction of subgrade, subbase, base course, and other Roadway structure Materials and in construction of ditches and other planned excavations and embankment designated on the Project for S.P. 8001-44 and S.P. 5605-24. This Work consists of providing credible and timely project information to the public and responding to the public's day-to-day needs, issues, and concerns. This work will consist of capturing source, hauler, and loading and delivery event data associated with the delivery of material to a contract in a standardized, digitalized format. This Work consists of building and basement removal performed in accordance with the provisions of S-26 (1701) LAWS TO BE OBSERVED (BUILDING REMOVALS OR MOVES) and MnDOT 2103 and MnDOT 2104. Assess and remove asbestos and regulated waste/material in accordance with all applicable laws and regulations. This Work consists of loading and hauling salvaged Materials, not required for installation elsewhere under this Contract, to the designated storage area(s) and depositing the Materials to the satisfaction of the Engineer in accordance with MnDOT 2104. This Work consists of handling contaminated materials found on the Project; including soil, groundwater, debris and/or vapor. This Work consists of designing, detailing, and installing a column supported embankment (CSE) consisting of columns, load transfer platform (LTP), settlement monitoring, pore-water pressure monitoring and temporary Work to support the TH 10 WB roadway from Station 1615+00 to Station 1625+50 (Existing Sta. 286+00 to 292+50). This Work consists of modifications to the LGU, City of Wadena utility systems including, the excavation and subsequent backfill necessary to expose the watermains, sewers, etc. for the purpose of disconnecting or connecting to the new Work. The Work shall be performed in accordance with MnDOT Standard Specifications and the Division SU Special Provisions included in this Proposal Package. This Work consists of providing additional traffic control devices in accordance with S-127 (2563) TRAFFIC CONTROL and as authorized by the Engineer. The Engineer is authorized to: (1) Require extra traffic control devices in addition to the traffic control devices shown in the Traffic Control Plan or in the Field Manual. (2) Require additional traffic control devices for EXTRA WORK. (3) Require extended use for all traffic control devices which are impacted by excusable and compensable delays, as defined in MnDOT 1806.2B. (4) Negotiate compensation for a Lump Sum Payment. This Work consists of providing a Traffic Control Supervisor during all major traffic control modifications to this project in accordance with S-127 (2563) TRAFFIC CONTROL. The Traffic Control Supervisor is responsible for managing the traffic control operations of the project, including those of the Contractor, Subcontractors, and suppliers. Traffic Control Management must be the Traffic Control Supervisor's primary responsibility. This Work consists of furnishing, installing, relocating, operating, maintaining and removing automated, portable, real-time Intelligent Work Zone (IWZ) system(s) meeting the requirements noted herein, during the duration of the Project. This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the Project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, "Temporary Suspensions". During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the Contractor the value of the device as determined by the Engineer. This Work combines the requirements of MnDOT 2573 with the temporary erosion control components of MnDOT 2575. It consists of designing and updating a Temporary Erosion and Sediment Control Plan (Temporary ESC Plan); managing stormwater, project-related water discharges, and project related pollutants; installing, maintaining, and removing temporary sediment controls; installing and maintaining temporary erosion prevention; and coordinating vegetation establishment Work. All of this is to be done as needed to keep the Project in full compliance with the NPDES Minnesota Construction Stormwater General Permit (CSW Permit), the Project Plans and SWPPP, these Provisions, and relevant Standard Specifications for the full duration of the Project and until permanent cover is established and the notice of termination for CSW Permit coverage has been submitted. This Work consists of removing, or salvaging, or both, in-place Materials in accordance with 2104 "Removing Pavement and Miscellaneous Structures", and as specified on the Plans and these Special Provisions. When specified on the Plans and these Special Provisions, this Work also consists of the following: (1) Disposing of Materials (2) Dismantling and cleaning Materials (3) Stockpiling and storing Materials (4) Handling, packaging, and loading Materials (5) Hauling and unloading Materials (6) Disconnecting electrical wiring, equipment, and components (7) Performing miscellaneous electrical Work (8) Excavating, backfilling depressions, holes, and trenches, and restoration Work (9) Other Work of a special nature as specified in the Contract or imposed by laws, ordinances, and regulations This Work consists of providing and installing materials, structures, and electrical equipment; and installing Department provided materials as specified for a complete operating new hardwire interconnected coordinated full-traffic-actuated traffic control signal systems at the intersection of TH 71 (Jefferson St) and Colfax Ave in Wadena, Wadena County,(SYSTEM C) in accordance with the 2565 "Traffic Control Signals," the Plans and these Special Provisions.

Bid Results

Roads / Highways

$52,134,146.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

1307

21

71

6

Subscribe For Documents

107 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Fireplaces and Stoves, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Cast-in-Place Concrete Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
156
All Active Projects
84
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

May 12, 2025

img_map_placeholder

Multiple Locations, Edwards, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grading, Roundabout, Bituminous and Concrete Surfacing, ADA Improvements - Multiple Locations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.