BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Harmar Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Scope of Work for Contract No. 24-s3 Includes Complete Manhole-to-manhole Cured in-place Lining of Approximately 4,000 Linear Feet of 8 Sanitary Sewer Including the Reinstatement of Approximately 64 Laterals and Required Bypass Pumping, Removal/trimming of Four Protruding Tap Break Ins, Traffic Control and All Necessary Appurtenance for Said Construction. This Project Was Financed [in Part] by a Grant From the Commonwealth of Pennsylvania, Commonwealth Financing Authority. Davis-bacon Prevailing Wage Rates Apply. Proposals Must Be Upon the Forms Furnished by the Township. The Bid Must Be Accompanied by a Certified Check or Bid Bond in the Amount of Ten Percent (10%) of the Bid, Made Payable to the Harmar Township to Guarantee the Bidders Entrance Into the Contract if Given the Award. No Bid Bond Shall Be Waived or Returned Because the Bidder Has Failed to or Cannot Comply With Any Requirements as Set Forth in the Plans, Specifications, or Any Applicable Statutes of the State of Pennsylvania or Any Applicable Municipal Ordinances. The Harmar Township Reserves the Right to Reject Any or All Proposals and to Waive Any Informalities in the Bidding. No Bid May Be Withdrawn for Ninety (90) Calendar Days After the Scheduled Time for Receipt of Bids. Any Technical Questions Regarding the Bid Documents Are to Be Directed to Lsse. Attention is Directed to the Fact That Procurement is Subject to All Requirements of the Davis-bacon Prevailing Wage Act (40 U.s.c. 3141-3148)and the Public Works Employment Verification Act (July 2012) Apply. The Township Shall (a) Award the Construction Contract to the Lowest Responsible Bidder Therefore, or (B) Reject All Bids Received Within Ninety (90) Days of the Date of Bid Opening; Provided, However, That the Township May, in Its Sole Discretion, Delay Such Award or Rejection for Up to One Hundred Twenty (120) Days From the Bid Opening Date Until the Township Has Received All Required Approvals From Other Governmental Agencies. Bidders on This Work Will Be Required to Comply With Title Vi of the Civil Rights Act of 1964.

Award

Water / Sewer

$155,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
37
Bidding Soon
777
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

September 20, 2024

img_map_placeholder

Chapel Downs, Harmar Township, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.