BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2024 at 8:00 PM

Updated August 31, 2024

Site work for a mixed-use development in Sanford, Colorado. Completed plans call for site work for a swimming pool; and water / sewer project.

McIntire Springs Fish Barrier and Aquatic Improvements. Technical Specifications related to construction materials and methods for work embraced under this Contract shall consist of references to, but not limited to, the Colorado Department of Transportation Most Current Standard Specifications for Roads and Bridge Construction. Special attention should be given to these references and revisions noted within. UNITS: LF= linear foot, LS= lump sum, EA = each, AC= acres The work shall be completed in 120 calendar days from the date of the Notice to Proceed. Question Deadline 08/16/2024 at 3:00 PM MT Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Kyle Hardie at kyle.hardie@state.co.us. The deadline for questions Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website at online. Project Coordinates: Latitude: 37 17' 5" N Longitude: 105 49' 7" W View Google Map Location The Colorado Division of Parks and Wildlife is accepting sealed bids for installation of a new concrete channel with primary and secondary fish barriers, and the installation of toe wood, log vanes, and boulder clusters. A five-percent (5%) Bid Bond, certified check, or cashier's check is required with bid proposals of $50,000.00 or more. Performance Bond, Labor and Material Bond: the Successful Bidder Shall Furnish a Bond in the Amount of 100% of the Contract Price for Performance and for Material and Labor Payment When Bid is Equal to or Exceeds $150,000. The Bond Shall Be Executed on The Standard State of Colorado Form. The State Requests That the Surety and Contractor Leave the Date of the Contract Found on the First Page of Each Bond Form, Blank and We Will 'pen' in the Date After the Controller Executes the Contract. These Bonds Will Be Submitted Along With the Standard State Agreement Form Within 10 Days of the "Notice of Award. LIQUIDATED DAMAGES: The parties agree that time is of the essence of the Contract and of the Specifications wherever a definite and certain length of time is fixed for the performances of any act. A daily charge will be made against the Contractor for each calendar day that any work remains uncompleted after the elapse of contract time. This daily charge will be deducted from any money due to the Contractor. This deduction will not be considered a penalty, but as liquidated damages. The liquidated damages set forth is an amount, agreed to by the Contractor and the Division, as reasonably representing additional project construction administration costs incurred by the Division and projected loss of revenue to the Park if the Contractor fails to complete performance within the contract time. For this project, the Liquidated Damages will be $450 per day. WORK HOURS ON PROJECT SITE: All work on this project site will be allowed as follows: 8am to 6pm or otherwise approved by the Project Manager. If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable.

Award

Water / Sewer

$226,235.00

Public - State/Provincial

Site Work

13

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
14
Bidding Soon
154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 10, 2024

Project location map

Co Rd V & County Rd W, Sanford, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.