BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2024 at 8:00 PM

Updated August 6, 2024

This is a service / maintenance or supply contract in Galena, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 24, 2024, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for construction contract 64B40, reconstruction of US 20 from 0.2 mile west of Logemann Road to Rush Street in Stockton, which includes reconstruction of the horizontal and vertical alignments to improve sight distance at various locations, and removal and replacement of the structure carrying US 20 over Rush Creek. The anticipated Letting for construction contract 64B40 is November 8, 2024. The anticipated construction completion date is May 31, 2027. The Consultant must complete and submit final measurements, calculations, electronic as-built survey data, and final contract records documents to the department no later than five (5) weeks after the construction completion date. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 27 - RFQ - US 20 From 0.2 Mile West of Logemann Road to Rush Street in Stockton, Phase III Project, Jo Daviess County, Region Two/District Two

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
108
Bidding Soon
1,329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

Project location map

US-20, Galena, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.