BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Demolition, site work, paving and renovation of a mixed-use development in Rice Lake, Wisconsin. Completed plans call for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; for the demolition of a sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

2024 Lift Station Improvements - Camelot Lane. Bidders must be pre-qualified with Rice Lake Utilities within the last year or must be pre-qualified for this work 5 days prior to the bid deadline in accordance with Section 66.0901 of the Wisconsin Statutes. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline construction. Rice Lake Utilities reserves the right to reject any and all bids and to waive informalities in any bid. Description: The proposed scope of work will generally include the following: o Construction of a 6-foot diameter precast concrete wetwell with integral valve vault structure near the existing lift station o Installation of approximately 70 feet of new 10-inch sanitary sewer and 90 feet of new sanitary force main o Street repairs to patch the existing curb, roadway, and parking areas o Installation of new electrical power and controls to the lift station control panel o Demolition of the existing lift station structure o Installation of new piping and valves in the wetwell / valve vault structure o Bypass pumping of the existing lift station as required to provide service throughout construction o Installation of the pumps, base elbows, rails, and other equipment, as well as miscellaneous control panel modifications to be completed by Quality Flow Systems via allowance item in the contract o Pigging of approximately 2,100 feet of the existing 6-inch force main to be completed by allowance item by HK Solutions Group Question Deadline 08/21/2024 Questions received less than five days prior to the date for opening of Bids may not be answered.

Bid Results

Roads / Highways

$446,317.00

Public - City

Demolition, Paving, Renovation, Site Work

13

18

10

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
141
Bidding Soon
1,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 27, 2024

Project location map

Camelot Ln, Rice Lake, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.