BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2024 at 8:00 PM

Updated September 18, 2024

Site work, remodeling, renovation and addition to a military facility in Mechanicsburg, Pennsylvania. Completed plans call for the addition of a military facility.

This Design-Build project will design and construct Electric Vehicle Charging Stations at Building 404 and Building 411 in accordance with the Unified Facilities Guide Specification 11 11 37, ELECTRIC VEHICLE SUPPLY EQUIPMENT. Building 404 currently has (4) light duty vehicles, (1) medium duty vehicle, and (3) heavy-duty vehicles while Building 411 currently has (1) light duty and (2) medium duty vehicles. Electric Vehicle Charging Station (EVCS) will consist of Level 2 AC Chargers and DC Fast Chargers. The charging stations are to be ordered via a blanket purchase agreement (BPA) with the Government Service Administration (GSA) contract GS-30F-0029Y, BPA Number GS-30F-GA082 with Apollo SunGard Systems, Inc. and installed in accordance with manufacturer’s instructions. (See Attached for Instructions) In addition, each location identified must be capable of receiving a strong cellular network signal. The Reference Signal Receive Power (RSRP) must be -100dBm or better. (Note that these numbers are all negative, so -80 dBm is stronger than -100 dBm, and -120 dBm is weaker.) Use a cellular signal detection device (such as an OctopusTM or Snyper-LTE GraphyteTM (USA) by Siretta) to take signal strength readings at the exact proposed Gateway location. If the test tool is capable of measuring the RSRQ value, ensure the value is higher than -10. (Again, where this is measured in negative numbers, so that -9 is higher than -10). The contractor/DOR shall survey the proposed locations and verify in accordance with the manufacture requirements that the proposed site is viable and is capable of connecting to the network. For Bid purposes assume a valid site acceptable to connect to the cellular network is within 100’ of proposed sites. Also, in addition to the electrical design and construction this project includes a civil aspect which includes but is not limited to installing new bollards, new parking lot painting and signage, new curb, and excavation. The project will require all site and survey work, engineering, design, materials, equipment, labor, and commissioning required to provide new, complete and operational electric vehicle charging stations. Question Deadline 09/06/2024

Post-Bid

Military

$5,000,000.00

Public - Federal

Addition, Remodeling, Renovation, Site Work

16

13

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
197
Bidding Soon
2,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2024

October 14, 2024

Project location map

Multiple Locations, Mechanicsburg, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.