EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2024 at 8:00 PM

Updated October 1, 2024

Site work, remodeling, renovation and addition to a military facility in Mechanicsburg, Pennsylvania. Completed plans call for the addition of a military facility.

This Design-Build project will design and construct Electric Vehicle Charging Stations at Building 404 and Building 411 in accordance with the Unified Facilities Guide Specification 11 11 37, ELECTRIC VEHICLE SUPPLY EQUIPMENT. Building 404 currently has (4) light duty vehicles, (1) medium duty vehicle, and (3) heavy-duty vehicles while Building 411 currently has (1) light duty and (2) medium duty vehicles. Electric Vehicle Charging Station (EVCS) will consist of Level 2 AC Chargers and DC Fast Chargers. The charging stations are to be ordered via a blanket purchase agreement (BPA) with the Government Service Administration (GSA) contract GS-30F-0029Y, BPA Number GS-30F-GA082 with Apollo SunGard Systems, Inc. and installed in accordance with manufacturer’s instructions. (See Attached for Instructions) In addition, each location identified must be capable of receiving a strong cellular network signal. The Reference Signal Receive Power (RSRP) must be -100dBm or better. (Note that these numbers are all negative, so -80 dBm is stronger than -100 dBm, and -120 dBm is weaker.) Use a cellular signal detection device (such as an OctopusTM or Snyper-LTE GraphyteTM (USA) by Siretta) to take signal strength readings at the exact proposed Gateway location. If the test tool is capable of measuring the RSRQ value, ensure the value is higher than -10. (Again, where this is measured in negative numbers, so that -9 is higher than -10). The contractor/DOR shall survey the proposed locations and verify in accordance with the manufacture requirements that the proposed site is viable and is capable of connecting to the network. For Bid purposes assume a valid site acceptable to connect to the cellular network is within 100’ of proposed sites. Also, in addition to the electrical design and construction this project includes a civil aspect which includes but is not limited to installing new bollards, new parking lot painting and signage, new curb, and excavation. The project will require all site and survey work, engineering, design, materials, equipment, labor, and commissioning required to provide new, complete and operational electric vehicle charging stations. Question Deadline 09/06/2024

Post-Bid

Military

$5,000,000.00

Public - Federal

Addition, Remodeling, Renovation, Site Work

16

13

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Membrane Roofing, Modified Bituminous Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Compression Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Flooring, Carpeting, Wall Finishes, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Exterior Specialties, Exterior Protection
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers, Residential Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Systems Furniture, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Electrical Utilities, Site Grounding, Communications Utilities, Communications Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
97
Bidding Soon
1,353
All Active Projects
625
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2024

October 14, 2024

img_map_placeholder

Multiple Locations, Mechanicsburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Electronic Vehicle Charging Station Building 404 and 411 at NSA- Mech

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.