BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sacramento, California. Conceptual plans call for site work for a water / sewer project.

This project includes the construction of a large diameter potable water transmission main that will convey water from the Vineyard Surface Water Treatment plant to the North Service Area (NSA) of Zone 40. The pipeline will range in size from 66-inch at the connection to the NSA Pipeline - Phase 1 project to 42-inch at the NSA point of connection at Sunrise Boulevard and Douglas Road. The total length of the pipeline is approximately eight miles. A CEQA document was approved for the project in 2010; however, it is anticipated that the CEQA document will need to be updated due to the long lapse of inactivity. The total project cost is $62,340,000. Pipeline construction is tentatively scheduled from 2024 to 2026. The project was formerly titled NSA Pipeline - Phase 1 and included the terminal tanks and booster pump station. The tanks and booster pump station were removed from the pipeline project to be a separate project: NSA Terminal Tanks and Booster Pump Station. The project is included in the Sacramento County's FY 2024-2029 Capital Improvement Program (CIP). As of September 9, 2024, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$592,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
46
Bidding Soon
1,605
All Active Projects
694
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

img_map_placeholder

To Be Determined, Sacramento, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.