BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work and new construction of a civil project in Sacramento, California. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This project includes the construction of a terminal tank and booster pump station site with 10 million gallons of storage. The site will be constructed in two phases with Phase 1 scheduled for completion in 2025 and Phase 2 at a future date to be determined by future demand needs. The total project cost is $29,923,000. The site will receive treated surface water from the Vineyard Surface Water Treatment Plant via the NSA Pipeline - Phases 1 & 2. A CEQA document was approved for the project in 2010; however, it is anticipated that the CEQA document will need to be updated due to the long lapse of inactivity. This project was formerly part of the project titled NSA Pipeline - Phase 1, which included the pipeline. The pipeline was separated into its own project: NSA Pipeline - Phase 2. Project is included in the Sacramento County's FY 2025-2029 Capital Improvement Program (CIP). As of March 20, 2025, information regarding a design team or a general contractor is not available. Design is anticipated 2028/2029. A firm timeline for construction has not been determined, however construction is anticipated to be completed in 2030.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$826,020.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
7
Bidding Soon
1,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2028

Project location map

To Be Determined, Sacramento, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.