Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Fountain, Colorado. Working plans call for site work for a road / highway.
All Bids Rejected Region: 2 Counties: El Paso, Teller Contract UDBE Goal: 0.00 % Guaranty: 5% of Total Bid Fixed Completion Date: 6/20/2025 This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 24 between Divide and Chipita Park and Hwy 67D in Woodland Park in Teller County, along Hwy 16 & 85A in and around Fountain, along Hwy 105 in Monument & Palmer Lake, Highways 21B & 83 in and north of Colorado Springs in El Paso County. This project is located in Region 2 in El Paso and Teller counties. Project work consists of removal and replacement of signs along various highways. Please contact Jimmy Biron at 719-546-5404 for all project questions. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CO DOT: 002 - Region 2- Sign Removal/Replacement Various Locations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work consists of constructing, installing, maintaining, and removing when required, control measures during the life of the Contract to prevent or minimize erosion, sedimentation, and pollution of any State waters as defined Section 101. Stormwater runoff from all disturbed areas and soil storage areas for which permanent or interim stabilization is not implemented, must flow to at least one control measure to minimize sediment in the discharge. This shall be accomplished through filtering, settling, or straining. The control measure shall be selected, designed, installed, and adequately sized in accordance with good engineering, hydrologic, and pollution control practices. The control measures shall contain or filter flows in order to prevent the bypass of flows without treatment and shall be appropriate for stormwater runoff from disturbed areas and for the expected flow rate, duration, and flow conditions (i.e., sheet or concentrated flow). The Contractor shall coordinate the construction of temporary control measures with the construction of permanent control measures to assure economical, effective, and continuous erosion and sediment control throughout the construction period.
Final Planning
Roads / Highways
$5,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
August 29, 2024
March 14, 2025
June 20, 2025
Multiple Locations, Fountain, CO
Related To This Project
Fountain, CO
Bid Date: Aug 30 2024
Fountain, CO
Bid Date: Sep 12 2024
Fountain, CO
Bid Date: Sep 16 2024
Fountain, CO
Bid Date: Oct 01 2024
Fountain, CO
Bid Date: Oct 17 2024
Fountain, CO
Bid Date: Jun 27 2024
Fountain, CO
--
Fountain, CO
Bid Date: Jun 13 2024
Fountain, CO
Bid Date: Mar 20 2024
Fountain, CO
Bid Date: Mar 13 2024
Fountain, CO
Bid Date: Feb 09 2024
Fountain, CO
Bid Date: Feb 05 2024
Fountain, CO
Bid Date: Jan 15 2020
Fountain, CO
Bid Date: Jan 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--