BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2024 at 8:00 PM

Updated August 27, 2024

Site work and paving for a road / highway in Campbellsport, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Road Reconstructions. 1. Northview Road-- 2845ft by 20ft-- Pulverizing, Staking to 24ft, Rough Grading and Compacting Existing Base; Final Grade, Water and Compact Prior to Paving; Paving 4" Wisdot Hma Blacktop Mat [2-layers at 2.25" & 1.75' Thick]; Apply a 2ft Shoulder Using 3.4" Crushed Gravel on Both Sides. 2. Nonn's Court--600 Ft X 18 Ft--pulverizing, Staking to 24ft, Rough Grading and Compacting Existing Base; Final Grade, Water and Compact Prior to Paving; Paving 3" Wisdot Hma Blacktop Mat [2-layers]; Apply a 2ft Shoulder Using 3.4" Crushed Gravel on Both Sides and Creating a Cul De Sac at the End of Nonn's Court. Insurance: the Contractor Shall Furnish and Deliver to the Town of Osceola a Certificate of Insurance for Worker's Compensation and an Umbrella Certificate of Liability and Property Insurance in the Minimum Amount of $1,000,000 Prior to Awarding Bids. The Town Board of the Town of Osceola Reserves the Right to Accept or Reject Any Proposals in the Interest of the Town.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
82
Bidding Soon
1,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

Project location map

Multiple Locations, Campbellsport, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.