BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Redmond, Oregon. Completed plans call for the renovation of a power facility.

Inquiries Pertaining To The Rfp And Requests For Rfp Packets Shall Be Directed To Wayne Powderly (Wayne.powderly@cumming-group.com), Deschutes County's Owner's Representative And Project Manager. All Firms Requesting An Rfp Packet Will Be Registered. The New Solar System Will Be Approximately 191 Kwdc And Valued At Approximately $640k. 1. Provide a management team member for this contract. 2. Compliance with building, fire, and accessibility codes. 3. Compliance with Occupational Safety and Health Administration (OSHA) 4. Support architectural design team and Deschutes County. 5. Provide and prepare cost estimates and cost assessment. 6. Provide solar system installation, shipment coordination, and delivery monitoring. 7. Responsible for removal and recycling of all packing material and debris. 8. Handling/resolving manufacturer's errors and/or damaged products. 9. Providing installation follow-up for adjustments, fine-tuning and touch-ups 10. Providing specification binders to Owner (including warranties) at the end of the project including O&M documentation. 11. Confirm to labor used to complete installation at the Job Site complies with all BOLI requirements for the vendors labor. 12. Provide all solar scope as described in Exhibit A. Additional spec requirements: A) Solar panels to have at least 25 year product, performance, and labor warranties B) Solar panels to have annual degradation rates of .25% or less, and 25 year performance at 90% or above The Consultant Selection Process Will Be Carried Out Per Ors 279c, And County And City Codes. Any questions regarding this RFP shall be received by the Cumming Group office no later than August 21, 2024. Questions shall be addressed to Wayne Powderly, via email (wayne.powderly@cumming-group.com)

Post-Bid

Solar Power Generation

$640,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
3
Bidding Soon
64
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

October 11, 2024

img_map_placeholder

3800 SW Airport Wy, Redmond, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.