Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 26, 2024 at 8:00 PM
Updated October 27, 2024
Site work for a playground / park / athletic field in Custer, South Dakota. Completed plans call for site work for a playground / park / athletic field.
Amendment 0004 is posted. See SF30 for details. *****************END*************************** Amendment 0003 is posted. See SF30 for details. *****************END*************************** A site visit will be held on Wednesday Sept 18, 2024, meeting at the site location at 10:00 Mountain time. POC is Toby Aberle, 605-490-7656, toby.aberle@usda.gov. 2. The period of performance shall be September 30, 2024, through July 02, 2025. The United States Forest Service is soliciting for the Veterans Point Trail Rehabilitation project located on Black Hills National Forest, SD. Period of Performance: 10/30/2024 to 10/31/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Location: Veterans Point Trail is located along Highway 385 on the north end of the Pactola Lake Dam approximately 15 miles west of Rapid City, South Dakota in the Black Hills National Forest. This includes all materials, equipment, labor, and incidentals required to perform all operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and other work that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. This item includes all Division 1 requirements such as but not limited to mobilization, demobilization, Bonding and Insurance, testing, and temporary facilities. -This contract lump sum Item references FP-14 Section 203. This item includes all materials, equipment, labor, and incidentals for cutting, removal, salvage, off-site disposal, replacement of asphalt pavement and base course, furnishings (tables and grills) and their concrete footings, and railings and filling holes and voids. This pay item also includes removal of benches, tables, and grills and their footings along trail and overlooks, and filling of holes and voids. This item also includes railing repair and replacement, with ancillary weld smoothing and primer application at locations at Site 9 and other location along Shoreline Loop of trail. This item also includes shaping and grading Site 9 to restore natural grade following material removal. Grinding of asphalt and base course to size for use on remainder of project is included in this Pay Item.
Post-Bid
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
