BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pensacola, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The 9th Avenue improvement project is part of the City of Pensacola's plan to improve resiliency during larger storm events and climate change along 9th Avenue from Bay Front Parkway to Romana Street. These improvements include raising the roadway grades and adjacent parking, construction of a new drainage structures, piping, and outfall into the bay, landscaping, and striping. This project also includes drainage and parking lot replacement on Romana Street. Any questions concerning the bid should be addressed and submitted in writing no later than 10:00 A.M., local time, August 30, 2024, to: Dedria Lunderman, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com The City of Pensacola reserves the right to accept or reject any or all bids, to award bids on a split-order basis by item number when applicable, to waive any bid informalities and to re-advertise for bids when deemed in the best interest of the City of Pensacola. The 9th Avenue improvement project is part of the City of Pensacola's plan to improve resiliency during larger storm events and climate change along 9th Avenue from Bay Front Parkway to Romana Street. These improvements include raising the roadway grades and adjacent parking, construction of a new drainage structures, piping, and outfall into the bay, landscaping, and striping. This project also includes drainage and parking lot replacement on Romana Street. The proposed improvements shall meet City and FDOT standards and specifications. The project shall be constructed in 240 days from the notice to proceed date. As a result of these improvements, work site safety, MOT, dewatering, maintenance/bypass of stormwater flow, and erosion control will be paramount issues. General work to be accomplished will include installation of new storm structures, new storm pipe, curb and gutter, asphalt, and sod. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. In the area of intersection with existing asphalt, pavement interface shall be saw cut and the perimeter milled to provide a clean seam between existing and proposed asphalt. Care shall be exercised to not cause any damage to adjacent infrastructure being left in place during reconstruction. Any such damage shall be the responsibility of the contractor. All grade work and elevations shall reflect the design information provided in the construction plans. All proposed line and grade work shall be approved by the City Inspector. Contractor's work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property and business owners at all times during construction. Due to the nature of the project, it is required that bidders visit the site and thoroughly review the plans and specifications. All work shall be in accordance with the standards and specifications of the City of Pensacola.

GC Bidding

Water / Sewer

$314,000.00

Public - City

Paving, Site Work

52

8

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
60
Bidding Soon
919
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 26, 2024

October 25, 2024

June 6, 2025

img_map_placeholder

S 9th Ave, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.