Renovation of a clubhouse / community center in Stanton, California. Completed plans call for the renovation of a clubhouse / community center.
The work to be constructed hereunder is located primarily at the Stanton Community Center, at City Hall, 7800 Katella Avenue (southwest corner of Katella Avenue and Cedar Street), in the City of Stanton. The work generally consists of conducting a site evaluation of the generator room and existing equipment, development of incidental design plans, obtaining all required permits, deferred submittals, mobilization and demobilization, removing existing portion of concrete slab, construct new PCC foundation pad for the proposed generator, installing the new turn-key generator with fuel supply tank containment, fuel supply system, exhaust and ventilation systems, vibration isolation, furnishing and install conduits and power supply wires from the point of connection to the new generator, installing new Automatic Transfer Switch (ATS) to connect to existing panel in the electrical room located adjacent to the generator room in the Stanton Community Center building, furnishing and installing all required electrical equipment and appurtenances necessary for the generator to be fully operational, obtain all required permits from applicable agencies, including OCFA and AQMD approval and permits for construction and to operate, confirmation of CalGreen & LEED compliance, providing all manuals and instructions to the City, resorting all damaged landscape, hardscape, or existing improvements caused by construction, and all incidentals to complete the work. Question Deadline 11/12/2024 at 12:00 PM PT Deadline for Questions at noon, Questions regarding the Contract Documents, requests for interpretations or clarifications, either administrative or technical, may be directed to the Assistant City Engineer, Elias Garcia, by email at EGarcia@StantonCA.gov. All written questions, if answered, will be answered in writing and conveyed to all interested bidders on or before November 14, 2024. Bids shall be valid for a period of 90 calendar days after the Bid opening date. Note: This is a Federal-Aid project and contractor shall comply with all Federal-Aid requirements. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Stanton as Bid Guarantee. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the Contract. Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Orange County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at online. As the project is funded / partially funded with CDBG-CV Federal Funds, the higher of the federal wage determination and the state wage determination shall be quoted. Appendix III Prevailing Wage Rate includes documents and links regarding the Federal Labor Standards. Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the Contract: Class "A" or "B" AND Class "C-10" (Electrical Contractor). The Contractor shall Complete all Work in every detail within forty-five (45) working days from the date of the Notice to Proceed, which is anticipated September 25, 2024, exclusive of maintenance periods. This project is a Community Development Block Grant (CDBG) project; so contractor shall ensure the project is completed in a timely manner. For further information, contact the Assistant City Engineer, Elias Garcia, at EGarcia@StantonCA.gov (e-mail) or 714-890-4237. Doc Notes: Bids must be submitted on the City's Bid Forms as hardcopies. Contractors need not purchase a hard copy set of plans from the City. To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, the City shall provide an electronic copy of the Contract at no charge to the contractor plan room. Bidders who do not have access to the platforms listed above, can request a hard copy of Bid Forms and Contract Documents by notifying the City via email at publicworks@stantonca.gov two (2) days in advance.
GC Bidding
Clubhouse / Community Centers
$175,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 26, 2024
December 12, 2024
7800 Katella Ave, Stanton, CA
Related To This Project
Stanton, CA
Bid Date: Sep 23 2024
Stanton, CA
Bid Date: Nov 20 2024
Stanton, CA
--
Stanton, CA
Bid Date: Sep 05 2024
Stanton, CA
Bid Date: May 27 2024
Stanton, CA
--
Stanton, CA
Bid Date: May 09 2024
Stanton, CA
Bid Date: May 02 2024
Stanton, CA
Bid Date: Apr 25 2024
Stanton, CA
Bid Date: May 06 2024
Stanton, CA
Bid Date: Apr 30 2024
Stanton, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.