Site work and paving for a mixed-use development in Mount Laurel, New Jersey. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 17, Project has been awarded. Award amount is $125,919.20** The work includes the furnishing of all labor, material, and equipment necessary or required to complete all work set forth in these Specifications. The base bid for this is to prepare the site for the installation of a prefabricated bathroom. To include but not limited to the installation of underground utilities (electric, water, and sewer), stone pad, and sidewalk. The prefabricated bathroom will be supplied and installed by others. Approximate estimated quantities for the major base bid work items are summarized as follows: material, and equipment necessary or required to complete all work set forth in these Specifications. The base bid for this is to prepare the site for the installation of a prefabricated bathroom. To include but not limited to the installation of underground utilities (electric, water, and sewer), stone pad, and sidewalk. The prefabricated bathroom will be supplied and installed by others. Approximate estimated quantities for the major base bid work items are summarized as follows: Approx. Estimated Item Quantity BASE BID 1. MOBILIZATION LS 2. EARTHWORK AND GRADING 39 SY 4. 3" HMA 19M64 BASE COURSE 850 1 SY 3. 2" H 9.5M64 SURFACE COURSE 39 SY 5.6" DGA SUBBASE 219 SF 7. ELECTRIC SERVICE COMPLETE 1 39 SY 6. CONCRETE SIDEWALK, 4" THICK 1 LS 8. WATER SERVICE - COMPLETE 1 AND 10 . 1 1/4" PVC FORCE MAIN LS 9. DOGHOUSE MANHOLE 80 LF 11. 4" SCH 40 PVC SEWER LINE 1 W/CLEANOUT 10 LF 12. DUPLEX PUMP STATION 1 LS 14. SILT FENCE AND 13. SITE STRIPING AND SIGNAGE 965 LF 15. 3/4" MINUS CRUSHED ROCK BUILDING PAD 720 SF 16. WATER AND LS 17. ASPHALT PRICE ADJUSTMENT FOR HOT MIX ASPHALT, IF NEEDED LS 18. FUEL PRICE ADJUSTMENT FOR HOT MIX ASPHALT, IF NEEDED SEWER STUB OUTS FOR BUILDING 1 1 LS Plans, Specifications, and forms of bid for the proposed work prepared by Pennoni Associates, Township Engineer, and approved by Mount Laurel Township have been filed in the office of said ENGINEER, at 515 Grove Street, Suite 1B, Haddon Heights, New Jersey 08035, and may be inspected by prospective bidders during regular business hours. The Township of Mount Laurel reserves the right to consider the bids for sixty (60) days after the receipt thereof, and further reserves the right to reject any or all bids, either in whole or in part and also to waive any informality in any and make such awards or take action as may be in the best interest of the Township of Mount Laurel, in accordance with applicable law. Bids shall be addressed to the Meredith Riculfy, Municipal Manager/Clerk, Township of Mount Laurel, 750 Centerton Road, Mount Laurel NJ 08054 and must be accompanied by a Certified Check, Bid Bond or Cashier's Check drawn to the order of the Township of Mount Laurel for ten percent (10%) of the total amount bid, provided said security need not be more than $20,000.00. All bid guarantees shall be accompanied by an executed consent from an approved surety company, licensed to conduct business in the State of New Jersey, agreeing to furnish the required Performance and Maintenance Bond upon the award of contract. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Playgrounds / Parks / Athletic Fields

$125,919.00

Public - City

Paving, Site Work

15

11

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
163
Bidding Soon
3,898
All Active Projects
1,601
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

To Be Determined, Mount Laurel, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.