BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Augusta, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Scope of Work includes approximately 5,492 of sidewalk improvements including new concrete sidewalk, curb & gutter, ADA compliant concrete curb ramps, detectable warning plates, ADA compliant handrails, concrete pavement, concrete approaches, crosswalks, pavement striping, retaining wall, roadway signage relocation, mailbox relocation, fence relocation, utility relocations/adjustments, landscape restoration, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Question Deadline 09/05/2024 Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. All questions concerning the bid document preparation and project specific questions can be directed to Cochran at 8 East Main Street, Wentzville, MO 63385, by phone at (636) 332-4574 or by email: mhackmeister@cochraneng.com. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below: Name: Michael Hackmeister, P.E. Address: 8 East Main Street, Wentzville, MO 63385 Phone Number: 636-332-4574 Email Address: mhackmeister@cochraneng.com All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The Town of Augusta anticipates issuing notice to proceed in September, 2024. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. the Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modots Consent. MODOT - Phase 1 Sidewalk Improvements - High St to Hackmann Rd

Bid Results

Sidewalks / Parking Lot

$834,800.00

Public - City

Paving, Site Work

78

14

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
49
Bidding Soon
861
All Active Projects
334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

img_map_placeholder

High St, Augusta, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.