BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work for a civil project in Augusta, Missouri. Completed plans call for site work for a water / sewer project.

The Scope of Work for the Project includes prefabricated booster pumping station, demolition of existing booster pumping station, piping, valves, electrical and SCADA. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Samantha Weidenbenner (636) 223-8062 sweidenbenner@woodardcurran.com Bid security in the amount of Five percent (5%) of the bid amount must accompany each bid, in accordance with the Instruction to Bidders. The Owner Intends to Award the Contract to the Most Responsive, Responsible Bidder Submitting the Lowest Bid. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Informalities Not Involving Price, Time or Changes in the Work in the Best Interest of the Owner. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after April 4, 2025, may not be answered The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. 1. Prefabricated Booster Pump Station, a. Three (3) 3 hp Pumps, b. One (1) 30 hp Pump, c. Flow Meters, Chlorine Analyzer, and other instrumentation, d. Electrical control panels, VFDs, manual transfer switch, 2. Suction and Discharge site piping, 3. Antenna and control panels including SCADA Polling Master Panel, 4. Three-phase power transformer and main power service feeders, 5. Installation of new electrical power conduits, communications conduits, and controls conduits, 6. Demolish existing booster pump station, 7. Site work and fencing, 8. Gravel parking area and drivewar 9. and all material and equipment, construction and services inherent to the Work

Award

Water / Sewer

$1,459,609.00

Public - County

Site Work

33

21

2

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
131
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2025

May 14, 2025

Project location map

Schluersburg Rd, Augusta, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.