BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Minneapolis, Minnesota. Completed plans call for site work for a water / sewer project.

PW-30th Ave S. Sanitary Sewer Replacement Event Number: 0000003105 Small and Underutilized Business Program (SUBP) Goals - 4% Combined MBE/WBE Employment Goals - 20% Female and 32% Minority This Contract requires open cut and trenchless replacement of a sanitary sewer located on the east side of South 30th Avenue between East 42nd Street and East 44th Street. Although not an exhaustive list, the work to be performed includes but is not limited to the following items: Mobilization of equipment to the project site Establishing site controls including groundwater monitoring, topographic surveying, preconstruction photographic documentation, post-construction surveying, geotechnical monitoring and subsurface utility locations. Subsurface utility location includes identifying the depth and location of house utilities (e.g., water, gas, electrical, sewer), storm mains and water mains. Coordinating with residents impacted by construction activities and permitting with stakeholder entities. Establishing traffic controls. Establishing sedimentation and erosion controls. Establish localized dewatering as needed for construction of sewer mains. Mark trees for removal and coordinate with coordinate with the City as required for construction of the new sewer main (if needed for construction). Ground stabilization as identified in the drawings prior to trenchless construction. Establishing flow bypass or other means to control residential flows when house services are interrupted from construction activities. Establishing flow bypass from sewer mains to the downstream sewer main when service is interrupted from construction activities. Trenchless and open-cut construction of a new sewer main. Connecting existing sewer service laterals to the newly construction sanitary sewer. Construction of new manholes along the new sewer main alignment. Replacement of an existing manhole where existing and new sewer mains connect. Abandon and partially remove the existing sewer that is to be replaced with the new sewer main. Restore hardscape and landscape impacted by construction. Sod replacement as needed. Question Deadline 09/05/2024 at 1:00 PM CT Questions prior to bidding and regarding bidding shall be directed to Kimberly Wilson at kimberly.wilson@minneapolismn.gov, at the City of Minneapolis. final completion date of May 31, 2025.

Bid Results

Water / Sewer

$1,249,351.00

Public - City

Site Work

42

3

2

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
790
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

img_map_placeholder

30th Ave S, Minneapolis, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.