BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2024 at 8:00 PM

Updated September 6, 2024

Site work for a water / sewer project in Meeker, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000360353 Located at: 912 E. Market Street, Meeker Colorado 81641 Meeker Airport Waterline Expansion Project will address the inadequate fire flow at the Rio Blanco County Meeker Airport - Coulter Field, by installing a new 12-inch High-Density Polyethylene (HDPE) water line to enhance fire protection capabilities. This project will significantly improve the water supply infrastructure, ensuring sufficient water flow for firefighting and other emergency needs. The contractor shall furnish all labor, equipment, services, and any materials not supplied by the County necessary to complete the project as specified in the contract documents. Question Deadline 08/26/2024 at 5:00 PM MT Questions are submitted online Yes, All Questions Due to Eric Jaquez, Operations Director. Any questions regarding this project are directed via email exclusively to the bid administrator. No interpretation of the meaning of the Scope of Work document will be made to any Bidders orally. Every request for such interpretation should be in writing addressed to the bid administrator. Contact information for the bid administrator is listed above. Planned Bid Award and Contract Executed : September 10, 2024 Project Planned Start : September 24, 2024 Project Planned Completion : March 29, 2025 Bidders must be thoroughly familiar with the Scope of Work and Agreement Documents included in this bid. Questions that are already addressed within these documents should not be submitted.Each Bidder is limited to submitting no more than ten (10) questions The County reserves the right to reject any or all Bids. Meeker Airport Waterline Expansion Project will address the inadequate fire flow at the Rio Blanco County Meeker Airport - Coulter Field, by installing a new 12-inch High-Density Polyethylene (HDPE) water line to enhance fire protection capabilities. This project will significantly improve the water supply infrastructure, ensuring sufficient water flow for firefighting and other emergency needs. The contractor shall furnish all labor, equipment, services, and any materials not supplied by the County necessary to complete the project as specified in the contract documents. N/A BID BONDS AND PERFORMANCE BONDS Bid bond coverage to be determined as a percentage of the total bid. Performance Bond in the amount of 100% of the Project Agreement.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

September 24, 2024

Project location map

912 E Market St, Meeker, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.