BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Rock Falls, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Hot-Mix Asphalt overlay. Estimate of Material Quantities Consist of: 246 Sq. Yds. Of Hma Surface Removal (Butt Joints), 4,020 Lbs. Of Bituminous Tack Coat, & 788 Tons of Hma Mix C, N50, Il-9.5 (Surface). Section #24-00000-01-gm Section Consists of a Hot-mix Asphalt Overlay and Associated Work of 0.46 Total Miles of Various Streets Within the Village of Lyndon. Estimate of Material Quantities Consist of: 321 Sq. Yds. Of Hma Surface Removal (Butt Joints), 2,517 Lbs. Of Bituminous Tack Coat & 490 Tons of Hma Mix C, N50, Il-9.5 (Surface). Section #24- 55000-01-gm Section Consists of a Hot-mix Asphalt Overlay and Associated Work of 2.07 Total Miles of Various Road in the Snavely Subdivision in Sterling Township. Estimate of Material Quantities Consist of: 1,380 Sq. Yds. Of Hma Surface Removal (Butt Joints), 26,173 Sq. Yds. Of Hma Surface Removal 3/4", 11,778 Lbs. the Whiteside County Public Works Committee Reserve the Right to Reject Any or All Bids, to Waive Technicalities and to Accept the Proposal Which is Most Advantageous to Whiteside County. Immediately prior to application of the tack coat, the Contractor shall sweep the roadway to the Engineer's satisfaction. Sweeping of all surfaces shall be considered incidental to the contract.

Award

Roads / Highways

$92,132.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
60
Bidding Soon
710
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

img_map_placeholder

McNeil Rd, Rock Falls, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.