BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2024 at 7:00 PM

Updated July 9, 2025

Renovation of an educational facility in Institute, West Virginia. Completed plans call for the renovation of a educational facility.

The Project includes the following Work: Removal of existing ballasted roofing system, installation of new EPDM roofing system and associated finish work of the Jones Hall, totaling approximately 7,902 square feet. The Work will be substantially completed within 120 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 30 days after the date when the Contract Times commence to run. Liquidated damages shall be $750.00 per day. The Work will be substantially completed and ready for final payment after the date when the Contract Times commence to run as listed above. Liquidated damages shall be $750.00 per day. Question Deadline 09/05/2024

Award

Educational

$158,260.00

Public - State/Provincial

Renovation

7

13

7

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

Project location map

To Be Determined, Institute, WV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.