EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 28, 2024 at 8:00 PM

Updated August 29, 2024

Site work and paving for a road / highway in Sterling, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County Whiteside Const. Hma Resurf. Incl. Hma Sc Il-9.5 C N50 (1,486 Ton), 449 S.y. Hma Surf. Rem., Butt Jt., 6,020 S.y. Hma Surf. Rem., 1.5", 35,010 Ft. Paint Pvm't. Mk. Line 4" & 8,429 Lb. Bit. Matl's. (Tack Ct.) Project Location: Reno Rd. & River Rd. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Const. HMA Resurface Proposed Improvement - HMA Surface Removal-1-1/2", Bit Surf Rem-Butt Joints, Bit. Matl (Tack), HMA Suface Course IL-9.5 N50, Paint 4" Line

Bid Results

Roads / Highways

$203,247.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
46
Bidding Soon
799
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

img_map_placeholder

River Rd & Reno Rd, Sterling, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.