BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Anchorage, Alaska. Completed plans call for the renovation of a military facility.

03 Sep 2024- Added Q&A for vendors to ba able to complete their quotes 673CS R1 NORTH UPS The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged. The government intends to establish a firm-fixed price contract for the following: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement. 1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements 1. New Batteries a. Remove and dispose of current batteries per EPA standards. b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable). 2. Visually inspect conditions and appearance of the following: a. Connection terminals inter cell/battery connectors, cables and associated hardware. b. Cell/battery covers, containers, and post seals. c. Battery racks or cabinets and associated components and hardware. d. Cell/battery jar or cover, noting any excessive distortion. 3. Perform cleaning of all accessible surfaces as required. 4. Conduct the following Inspections: a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary. b. Inspect all power connections for signs of overheating c. Inspect all subassemblies, bridges and legs for signs of component defects or stress d. Inspect all DC capacitors for signs of leakage e. Inspect all AC capacitors for signs of leakage f. Inspect and inventory all customer-owned spare parts g. Inspect for, and perform as required, any open engineering changes 5. Reporting of Battery Update Visit: a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site. 6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed: a. Internal Operating Parameters i. DC Ground Detection Offset (if applicable) ii. Inverter leg current average balance (if applicable) iii. Output filter current average phase balance iv. Rectifier bridge current average leg balance v. AC Protection settings are checked vi. DC Protection settings are checked vii. Input and Output Frequency and Voltage Bandwidth settings are checked viii. Verify DC filter capacitance ix. Verify AC tank and trap filter capacitance x. Power Supply voltages and waveforms xi. Update UPS firmware as necessary b. External Operating Parameters i. System Input Voltages (all phases) ii. System Input Currents (all phases) iii. DC Charging Voltages (float and equalize), record settings, adjust to nominal iv. Rectifier phase on and walk up Scope of Work v. Inverter phase on and walk up vi. Adjust all panel meters to measured values vii. System Bypass Voltages (all phases) viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable) c. Outage simulation, and battery capability testing, and verify charger current limit. Environmental Parameters i. UPS area ambient temperature and condition of ventilating equipment ii. General Cleanliness of UPS Power Module iii. General Cleanliness of UPS area iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable) v. Clean outside of UPS including control panel/CRT screen Any questions shall be directed to the POCs listed above IN WRITING to the email addresses robert.briggs.13@us.af.mil and jason.topick.1@us.af.mil no later than 1400 Alaska Standard Time (AST) on 30 August 2024. All questions will be posted and answered by amendment following this date.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

3

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
11
Bidding Soon
333
All Active Projects
164
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2024

October 7, 2024

img_map_placeholder

Dena'ina Rd, Anchorage, AK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.