BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a conference / convention center in Minneapolis, Minnesota. Completed plans call for the remodel of a conference / convention center.

MCC - BID - Concessions 136 Remodel DESCRIPTION OF THE WORK A. The project is the remodeling of existing Concessions 136 space to become a retail grab-and go shop. Work includes, but is not limited to, finishes, doors, lighting, electrical, mechanical, minor structural, kitchen equipment, and associated elements. The project is being constructed in an open and operating convention center; all precautions shall be taken to not disrupt the daily operations of the facility. CONTRACT REQUIREMENTS A. Comprehensive Scope of Work: Provide labor, material, and equipment necessary to properly execute the work of the Work Scope in accordance with Contract Documents and specifically the specifications sections listed herein. 1. Contract Documents are complementary, and what is required by one shall be as binding as if required by all. 2. The contractor is responsible for the general, architectural, mechanical, and electrical notes as they relate to your Work. 3. It is the intent of this Work Scope and responsibility for this contractor to provide a complete operational assembly/system, unless specifically indicated below. 4. Review the entire project so that proceeding, concurrent and succeeding work of other contractors can proceed without harm to the Project as a whole. 5. By submitting your Proposal/Bid, the contractor acknowledges they have reviewed all appropriate contract documents, including previously issued documents and have anticipated, based on information provided or available, impact of future Work as it affects their Work Scope Category. B. Clarification: The Specification are written in imperative and abbreviated form. 1. It shall be clearly understood that all imperative statements are directed at the subcontractor responsible for that portion of the Work, unless specifically indicated otherwise. 2. Incomplete sentences shall be completed by inserting "shall", "contractor shall", and similar mandatory phrases by inference in the same manner as they are applied to notes on Drawings. 3. The words "shall be" shall be supplied by inference where a colon is used within sentence or phrases. Question Deadline 09/04/2024 at 2:00 PM CT

Bid Results

Conference / Convention Centers

$642,500.00

Public - City

Remodeling

41

21

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
790
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

img_map_placeholder

1301 2nd Ave S, Minneapolis, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.