BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Faribault, Minnesota. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of October 2, 2024. City Council reject all bids and rebid the project for 2025 construction. Straight River Watermain Crossing. All work is to be done in accordance with the MnDOT Standard Specifications for Construction - 2020 Edition, the City Engineers Association of Minnesota Standard Specifications -2023 Edition, and the Special Provisions. The work includes approximate quantities of major items as follows: 1. Common Excavation - 350 CY 2. Common Embankment - 400 CY 3. Bituminous Pavement - 300 TON 4. Direction Drilled Watermain - 800 LF 5. Concrete Walk - 1,000 SF 6. Bituminous Walk - 1,200 SF 7. Curb and Gutter - 500 LF 8. Turf Establishment - 2,000 SY Question Deadline 08/30/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as Dan Coyle, Telephone: (651) 319-2454, Email: Dan.Coyle@Kimley-Horn.com s. Questions received less than seven days prior to the date for opening of Bids may not be answered The Cost To Submit a Bid is $25. Bids Must Be Accompanied by a Corporate Surety Bond Made in Favor of the City of Faribault for at Least 5% of the Total Bid Amount. The City reserves the right to reject any or all bids and to waive any informalities or irregularities. No bidder may withdraw their bid for a period of 30 days.

Final Planning

Water / Sewer

$1,373,469.00

Public - City

Paving, Site Work

22

25

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
45
Bidding Soon
768
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

April 2, 2025

img_map_placeholder

To Be Determined, Faribault, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.