Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Site work and paving for a civil project in Faribault, Minnesota. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
The estimated cost is around $3.3M Contract Description: County Road 50 (Cagger Trail) Construction Location: CR 50 From near Cabot Ave to CSAH 20 (Cannon City Blvd) Construction Surveying 1 LUMP SUM Clearing 1.50 ACRE Grubbing 1.50 ACRE Select Granular Borrow 12,670 CU YD Excavation - Common 45,102 CU YD Subgrade Soil Modification 40,080 SQ YD Aggregate Base Class 5 15,600 TON Cement 1,065 TON Type SP 9.5 Wearing Course Mix (2,C) 3,165 TON Type SP 12.5 Wearing Course Mix (2,C) 4,265 TON Type SP 12.5 Non Wear Course Mix (2,C) 4,130 TON 8x5 Precast Box Culvert 98 LIN FT CS Pipe Culvert (18"-42") 872 LIN FT 4" Perf PE Pipe Drain 14,030 LIN FT RC Pipe Sewer Des 3006 CL III (24"&30") 208 LIN FT Traffic Control 1 LUMP SUM Silt Fence, Type MS 9,150 LIN FT Rolled Erosion Prevention Category 20 & 25 45,090 SQ YD Seeding 11.12 ACRE Mulch Material Type 1 28.24 ACRE Line Multi Comp GR IN (WR) 28,930 LIN FT Line Paint 28,555 LIN FT Each bid must be accompanied by a corporate surety bond made in favor of Rice County in the amount of at least 5% of the bid price. A Performance Bond payable to Rice County, in the full amount of the bid shall be furnished by the successful bidder The County reserves the right to reject any or all bids without question Award Date: 1/28/2025 Contract Start Date: 3/10/2025 Construction Start Date: 3/10/2025 Construction End Date: 6/26/2026 MN DOT: County Road 50 (Cagger Trail) Reconstruct Direct questions about this Project, including pre-bid questions, to Bill Zidon at 507-384-6431 and Bill.Zidon@ricecountymn.gov.
Award
Roads / Highways
$2,881,692.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
March 10, 2025
Cagger Trail, Faribault, MN
Related To This Project
Faribault, MN
Bid Date: Jan 30 2025
Faribault, MN
Bid Date: Feb 06 2025
Faribault, MN
Bid Date: Mar 21 2019
Faribault, MN
Bid Date: Mar 26 2025
Faribault, MN
Bid Date: Mar 17 2025
Faribault, MN
Bid Date: Apr 10 2025
Faribault, MN
Bid Date: Apr 14 2025
Faribault, MN
Bid Date: Apr 16 2025
Faribault, MN
Bid Date: Dec 17 2024
Faribault, MN
Bid Date: Nov 12 2024
Faribault, MN
Bid Date: Nov 12 2024
Faribault, MN
Bid Date: Oct 30 2024
Faribault, MN
Bid Date: Feb 20 2025
Faribault, MN
Bid Date: Mar 19 2025
Faribault, MN
Bid Date: Jul 17 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
