EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 8, 2024 at 7:00 PM

Updated October 1, 2024

Demolition and site work for a recreation facility in Phoenixville, Pennsylvania. Completed plans call for the demolition of a recreation facility; and for site work for a recreation facility.

Questions in regard to the Invitation to Bid shall be directed in writing to Mr. Kevin Shych, Senior Buyer, by email to kshych@chesco.org, or online via publicpurchase.com. The deadline for the receipt ofwritten questions will be 12:00 p.m. on August 19 2024. County of Chester solicits bids for Demolition of House and Garage at Black Rock Sanctuary Related Documents: Drawings and general provisions of the Contract, including General Terms and Conditions, Special Conditions, General Specifications, Technical Specifications, Prevailing Wage Rates, Bidder Checklist, and Bid Submission Instruction Sections, apply to this Section. Section Includes: a. Demolition and removal of existing buildings and limited site improvements following building demolition. b. Removal of limited ACM Floor Tile and Mastic. c. Removal of limited Lead Based Paint in the house and garage. d. Removal of limited Hazardous Wastes. The pre-demo inspection identified ASTs, fluorescent light tubes and associated light ballasts, HVAC equipment and containerized chemicals. e. Abandoning in-place and/or removing below-grade construction as noted on the Demolition Plans. f. Disconnecting, capping, or sealing, abandoning in-place and removing site utilities.

Award

Amusement and Recreation

$41,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
201
Bidding Soon
3,039
All Active Projects
1,480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2024

November 11, 2024

img_map_placeholder

953 Black Rock Rd, Phoenixville, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Demolition of House and Garage at Black Rock Sanctuary

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.