BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Phoenixville, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Work Included: Renovations and site improvements to Blackrock Park in Ridley Township. All areas disturbed during construction shall be restored to its original condition or better. The Contractor shall be responsible to replace any curb, sidewalk, signage, parking meter, etc. per the lump sum site restoration item. No additional monies will be given to the Contractor to restore the site. All pavement restoration areas shall be neat, straight, joint lines. Narrow asphalt strips between curb and trench will not be acceptable. Major items include 1070 square yards of pervious path, 110 square yards of bituminous parking paving,170 linear feet retaining wall, and 60 cubic yards of rain garden. The successful bidder, who is awarded the contract, will be required to pay online a fee of 1/4 % of the contract award value. There is a minimum award fee of $100.00 and a maximum of $5,000.00. Bidders must confirm the fees associated with bidding through online and the successful bidder is responsible for the fees associated with the awarded bid. A bid bond in the amount of ten percent (10%) of the total bid, made payable to the Township of Ridley, must accompany each bid. Question Deadline 04/10/2025 at 2:00 PM ET Attention of Bidders is called to all of the requirements contained in the bid package, particularly to the PA Prevailing Wage Rates, Public Works Employment Verification Form, various insurance requirements, various equal opportunity provisions, and the requirements for a payment bond and performance bond for 100% of the contract price and a one-year maintenance bond for 10% of the contract price. All Contractors and Subcontractors of any tier that perform work under this contract must comply with the Township of Ridley Ordinance No. 2048 - Minimum Standards of Contractor Responsibility. Each bidder must submit a Contractor Responsibility Certification, and if applicable, a Subcontractor list and Subcontractor Responsibility Certification with the bid. Failure to submit the documents may result in bid being rejected. The Township of Ridley reserves the right to accept or reject any or all bids or parts thereof, and to waive any informalities in the bidding, as them deem in the best interest of the Township.

Award

Roads / Highways

$159,220.00

Public - City

Paving, Site Work

7

13

4

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
785
Active Projects
348
Bidding Soon
4,968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

July 15, 2025

Project location map

1286 Black Rock Rd, Phoenixville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.