Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2024 at 8:00 PM
Updated September 11, 2024
This is a service / maintenance or supply contract in Kenmore, Washington. Contact the soliciting agency for additional information.
Project Description Contract C0928; 451 Zone Control Valve Facility and Control Valve Vault Schedule A consists of the following work: Schedule A - Site 46 - 112th Avenue NE FCV consists of con structing a new partially buried 930+- square foot concrete and CMU building whose main function is to house hydraulic control valves, flow meter, and piping that connects to the Seattle Public Utilities Tolt pipeline and directs flows to different pressure zones within the Northshore Utility District water service area. The project also includes a significant amount of site excavation, a soldier pile wall, a new driveway with new connection to existing road, frontage improvements, site piping, right-of-way piping, existing vaults demolition, and both site and right-of-way restoration. Schedule B consists of the following work: Schedule B - Site 69 - 451/446 Zone Separation Valve Vault consists of a new underground vault, site piping, and a standalone above ground electrical enclosure with a control panel. The vault will, house a electronic control, valve and site piping will connect to existing site piping at two locations. Site electrical will connect. to an existing transformer nearby in the right-of-way. Approximate locations of the proposed improvements are shown on the project construction plans. The engineer's construction cost estimate is $4.000,000.00 including sales tax. Each hid must be submitted on the "Proposal" forms provided m Section 5 of the "Specifications, Proposal and Contract Documents" and shall be accompanied by a bid proposal deposit in the form of a surety bond, post al money order, cashier's check or certified check made payable to King County Treasurer, King County, Washington for a sum of not less than 5 percent of the total bid. A bid shall not be considered unless accompanied by such bid proposal deposit. CONTRACT AWARD A contract, if awarded, will be based upon the lowest responsive and responsible bid or bids as defined in more detail in the bid documents. Northshore Utility District reserves the right to reject any and all bids, to delete portions or all of the work, to substitute alter native bid item prices for base bid item prices, to waive any informality in bidding, and to make the award deemed to be in the best interest of the District. Proposals received after the time announced for the opening will not be considered. No bidder may withdraw its bid after the time announced for the opening or before the award and execution of the contract(s) unless the award is delayed for a period exceeding sixty (60) calendar days.
Post-Bid
Water / Sewer
$4,000,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2024
November 11, 2024
Multiple Locations, Kenmore, WA
Related To This Project
Kenmore, WA
Bid Date: Jan 29 2025
Kenmore, WA
--
Kenmore, WA
--
Kenmore, WA
--
Kenmore, WA
Bid Date: Apr 24 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
