BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Kenmore, Washington. Design plans call for the demolition of a bridge / tunnel; for the construction of a 75,760-square-foot bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replace existing fish passage barrier culvert with new culvert. The existing culvert crossing at the intersection of Tributary 0056 and NE 175th St is connected to a privately owned culvert downstream and a King County culvert directly upstream. The crossings were evaluated by WDFW on March 29, 2006, but a barrier status was not determined. The city owned portion of the crossing consists of two 42-inch culverts. The City has identified this group of crossings as a high priority for replacement using the Culvert Prioritization Spreadsheet due to its significant environmental benefits. The project will result in a fish habitat gain of 75,760 square feet for many potential species including resident trout, steelhead trout, and coho salmon. As of September 2024, the City has coordinated with Washington State Department of Transportation (WSDOT) to jointly apply for federal funds to pay for a significant portion of this project. WSDOT is currently preparing to replace their upstream culvert under SR 522 and daylight the stream north through the existing Jack in the Box property located on the north side of SR 522. The city is also coordinating with King County and downstream property owners to design the project. As of March 7, 2025, this project is included in the city's 2025-2030 Capital Improvement Program (CIP). It is currently in the design phase. Construction should begin in mid 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Bridges / Tunnels

$7,966,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
1
Bidding Soon
975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

NE 175th St & 61st Ave NE, Kenmore, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.