Site work and renovation of a civil project in Cold Spring, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Water Treatment Plant Backwash Tank. a. A Poured in Place Concrete Backwash Tank Including Concrete Lid. The Tank Will Have a Sump at One End for Sludge Collection. B. A Submersible Decant Pump and Floating Suction Head to Pump to the Overflow of the Backwash Tank (Connected to the Existing Backwash Drain and Outlet Structure). C. Electrical and Controls for the Decant Pump. Level Monitoring in the Backwash Tank. Changes to the Plant Scada System and Programing. D. A New Chemical Dosing Skid in the Ach Room. A New Chemical Injection Port in the Backwash Pipe in the Wtp. Integration of the New Chemical Dosing Into the Scada System. E. A Drainpipe for the Backwash Tank With Valving and New Manhole on the Wtp Sanitary Main. 16" Watermain Pipe to Connect the Existing Backwash Drainpipe to the Backwash Tank. Cut in Tees and Valving as Necessary. F. Grading, Seeding, and Driveway Patching for Tank and Pipe Installation. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and Further Reserves the Right to Award the Contract to the Best Interests of the Owner. The Successful Bidder Must Be a "Responsible Contractor." the Term "Responsible Contractor" Means a Contractor as Defined in Minnesota Statutes, Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project, and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. Question Deadline 08/29/2024

Award

Water / Sewer

$723,145.00

Public - City

Renovation, Site Work

17

23

7

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
41
Bidding Soon
708
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

To Be Determined, Cold Spring, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.