BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2024 at 8:00 PM

Updated October 29, 2024

Demolition, renovation and addition to an educational facility in Grand Junction, Colorado. Working plans call for the addition of a 74,500-square-foot educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

Reference Number 0000360926 Job Location: Colorado Mesa University Main Campus 1100 North Avenue Grand Junction, Colorado United States 81501 Colorado Mesa University (CMU) is soliciting the submittal of proposals from qualified firms to provide Construction Management/General Contracting (CM/GC) services for the Performing Arts Renovation and Expansion Project located on the CMU Campus in Grand Junction, Colorado. The Moss Performing Arts Building was constructed in 1968 and is approximately 74,500 sf. Currently, the Performing Arts Building houses the University's Department of Theatre Arts and Music programs; the University anticipates the facility to be occupied during construction. The goal of the project is to address safety, accessibility and code compliancy all while addressing space utilization by increasing the capacity to accommodate additional students, staff and community members. This State funded expansion and renovation project has been divided into two phases. The first already completed expansion phase, was the construction of a new theatre across campus from the existing building. This second renovation phase will address the existing building deficiencies, including acoustical, accessibility and aesthetic. Incorporated into this project will be the mechanical work necessary to connect the Moss Performing Arts Center building to the campus geo exchange system. Question Deadline 8/29/24 at 11:00 AM MT Questions are submitted online Yes Anticipated Construction Start/Finish 11/01/2024 - 08/01/2025 This State funded expansion and renovation project has been divided into two phases. The first already completed expansion phase, was the construction of a new theatre across campus from the existing building. This second renovation phase will address the existing building deficiencies, including acoustical, accessibility and aesthetic. Incorporated into this project will be the mechanical work necessary to connect the Moss Performing Arts Center building to the campus geo exchange system. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information

Pre-Construction/Negotiated

Educational

$10,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation

6

11

4

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
11
Bidding Soon
136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

November 1, 2024

Project location map

1100 North Ave, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.