Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Lilburn, Georgia. Completed plans call for the renovation of a educational facility.
All bidders must submit AIA Document A305 Contractor=s Qualifications Statement to be evaluated by the Owner and Architect prior to being issued plans and specifications. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractor=s ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified. General Contractor=s main office where work for this project will be completed shall be a permanent office located in the state of Georgia within a seventy five (75) mile radius of the project site. This office shall have been in existence for no less than ten (10) years. NOTE: AIA Document A305-2020 is specified for this project and will be for other projects going forward. Any bidder may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any bidder that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the bidder feels that the disqualification is unfounded. The written appeal from the disqualified bidder will not change the decision already made on this project. However, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett County Public School System projects. A copy of the bidding documents, including drawings and project manuals shall be available at the Architect's office and the Owner's office for viewing only Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five percent (5%) of the Base Bid Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum, will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paperwork such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. Construction can begin during the school year on weekends and during student breaks as approved by the Owner. Full access to the building will begin on Thursday, May 22, 2025. All construction must be substantially complete by Monday, July 21, 2025. The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Architect, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld.
Post-Bid
Educational
$590,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
October 21, 2024
958 Cole Dr SW, Lilburn, GA
Related To This Project
Lilburn, GA
Bid Date: Sep 19 2024
Lilburn, GA
Bid Date: Oct 09 2024
Lilburn, GA
--
Lilburn, GA
--
Lilburn, GA
--
Lilburn, GA
--
Lilburn, GA
Bid Date: May 10 2024
Lilburn, GA
Bid Date: Apr 16 2024
Lilburn, GA
Bid Date: Sep 16 2024
Lilburn, GA
--
Lilburn, GA
Bid Date: Apr 22 2024
Lilburn, GA
Bid Date: Dec 12 2023
Lilburn, GA
Bid Date: Dec 06 2023
Lilburn, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.