BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a clubhouse / community center in Lawndale, California. Completed plans call for the renovation of a clubhouse / community center.

Community Center Roof Replacement Project QUESTIONS OR REQUESTED CLARIFICATIONS SHALL BE MADE IN WRITING PUBWKS@CITYOFWHITTIER.ORG ON OR BEFORE AUGUST 29, 2024 AT 4:00 PM NO VERBAL REQUESTS WILL BE ACCEPTED. The Community Center Roof consists of four (4) roofs; Gymnasium Roof, Lower Roof (including cooling tower roof), Theater Roof and Upper Roof as shown on the Project Location Map. The work to be performed at the Community Center includes but is not limited to: asbestos removal and disposal; remove and haul existing roof layers down to the decking; prepare roof for new roof layer; remove, furnish and install roof floor drains, remove existing and install new flashing; and furnish and install new roof with WeatherWeld (or approved equal). All labor, materials, tools and equipment, and all incidental and appurtenant work necessary for the proper construction of the Community Center Roof Replacement project shall be in accordance with the project specifications as specified hereinafter for the City of Whittier, Los Angeles County, State of California, in accordance with the Standard Specifications for Public Works Construction (Greenbook), 2021 Edition, International Code Council Evaluation Service Report (ICC ESR), including all supplements and with the current California Building Code and all local amendments. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee permit(s) for the project from the City of Whittier, Building Department.

Award

Clubhouse / Community Centers

$574,525.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
105
Bidding Soon
2,249
All Active Projects
995
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 9, 2024

img_map_placeholder

4118 Rosecrans Ave, Lawndale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.