BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in East Liverpool, Ohio. Completed plans call for site work for a water / sewer project.

Waste Water Treatment Plant Improvements - Phase 1 The work to be performed under this contract is located within the City of East Liverpool, Ohio at the City of East Liverpool Waste Water Treatment Plant (500 West 4th Street) and which includes the following general improvements: removal & replacement of outdated and/or non-functioning equipment, removal & replacement of deteriorating equipment incidentals, and general maintenance work in the following locations: Headworks/Carpenters Run Pump Station; Inflow Retention Basin; Grit Building; Digesters; and Control Building. Each bidder shall be required to complete and file with their bid the enclosed Bid Guaranty, Performance and Payment Bond, Warranty Bond Form (Section 153.54 O.R.C.) issued by a Surety Company licensed and authorized to transact business in the State of Ohio. Each bid must be accompanied by either a Bid Bond in the amount of (100%) of the "Total Amount Bid" or a Bid Guaranty in the form of a certified check, cashier's check or letter of credit upon a solvent bank in an amount equal to (10%) of the "Total Amount Bid". This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). Attention is called to certain Federal requirements on this project, including but not limited to Federal Prevailing Wage Rates, DBE Requirements, and Domestic Steel & Iron Product Requirements. Federal law prohibits preference to local contractors as per FHWA's "Contract Administration Core Curriculum Participant's Manual and Reference Guide 2001" (Chapter II A) and as per Form FHWA-1273. City of East Liverpool, Ohio Ordinance No. 49, adopted on September 16, 1996, gives preference to Local Contractors who bid for City Contracts. This City Ordinance is not applicable to this Contract. The City of East Liverpool reserves the right to reject any or all bids and waive any informality in the bidding. No bidder may withdraw their bid within one hundred twenty (120) days after the actual date of the opening thereof. The Engineer's Total Estimated Construction Cost for this project is $4,258,000.00. DBE GOAL: 2.3% (1.3% MBE'S and 1.0% WBE's)

Award

Water / Sewer

$4,226,700.00

Public - City

Site Work

139

7

34

10

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
59
Bidding Soon
1,168
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

February 20, 2025

img_map_placeholder

500 W 4th St, East Liverpool, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.