BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2024 at 8:00 PM

Updated July 3, 2025

Site work and paving for a civil project in Fernley, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. The Work generally includes but is not limited to: the removal and replacement of approximately 1,500 feet of sewer line, 2,000 feet of water line, and 1,000 feet of storm drain, storm drain manhole and sanitary sewer manhole removal and replacement, concrete and asphalt surface improvements, roadway striping, and utility adjustments. Question Deadline 09/05/2024 Shadow Lane Reconstruction Project. The Engineer’s Estimate is $5,600,000 Site Address: Shadow Lane. Est. Completion Date: Sept. 12, 2024. Description: The Work generally includes but is not limited to: the removal and replacement of approximately 1,500 feet of sewer line, 2,000 feet of water line, and 1,000 feet of storm drain, storm drain manhole and sanitary sewer manhole removal and replacement, concrete and asphalt surface improvements, roadway striping, and utility adjustments.

Award

Roads / Highways

$5,440,000.00

Public - City

Paving, Site Work

42

21

2

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
21
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

November 11, 2024

Project location map

Shadow Ln, Fernley, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.