Site work and paving for a mixed-use development in Monroe, Georgia. Completed plans call for site work for a pipeline; and for paving for a pipeline.

The Project consists of: CONTRACTOR Installation of approximately 13,400 feet or 2.54 miles in overall length of 4- inch Steel High Pressure Gas Pipeline to serve the Walton County Jail, Including Two Horizontal Directional Drills Under GDOT Highway 78 in compliance with GDOT permits, with HDD 01 at approximately 275 feet and HDD 02 at approximately 420 feet in length, and Open Cut Construction of the remaining sections Under City of Monroe Streets and other ROW and/or easements acquired by the City of Monroe. CONTRACTOR to provide pre and post installation pressure testing of HDD 01 and HDD 02 pipe segments other pipe segments will require a single pressure test by OWNER and ENGINEER approved testing mediums and methods. All components and workmanship for this project to comply with CFR 49 DOT 191 -192 Pipeline Safety Regulations, State of Georgia Public Service Commission Regulations for Gas Utilities, the City of Monroe O&M and Construction Standards, GDOT PERMITS AND TRAFFIC CONTROL STANDARDS, FEDERAL HIGHWAY ADMINISTRATION (FHWA) MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), City of Monroe, Georgia and Georgia EPD permits and other applicable code, permit and regulatory requirements for this project. The project design requires materials procurement and workmanship by a qualified and experienced gas CONTRACTOR to achieve applicable regulatory codes for the pipeline and for an MAOP of the pipeline of 566 PSIG. The minimum test pressure will be 850 PSIG. Gas Tie ins Include in service welding to CFR 49 DOT 192, API 1104, and City of Monroe Welding Procedures of a weld on bottom out fitting and hot tap at Station 0+00 on the City of Monroe's high pressure feeder line. CONTRACTOR to provide a prefabricated and pretested station riser with monolithic insulator at the project terminus to connect to a M&R station installed by the City of Monroe. The City of Monroe to stake the riser location. CONTRACTOR to provide all equipment materials as specified in the bid documents, drawings, and specifications with approval prior to purchasing by the OWNER and /or OWNER'S ENGINEER. Questions are required to be submitted in writing and are due by email to fred.hanna@gmcnetwork.com on Thursday, September 12, 2024 @ 1PM EST.

Post-Bid

Pipeline

$150,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
97
Bidding Soon
1,517
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

November 5, 2024

img_map_placeholder

1425 S Madison Ave, Monroe, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.