BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work, paving, renovation and addition to an educational facility in Sullivan, Missouri. Completed plans call for the addition of a 20,300-square-foot educational facility; and for the renovation of a 178,000-square-foot educational facility.

A. Provide seismic restraints as indicated for each type of equipment and for piping systems. This section applies to Fire Protection Systems. B. Scope of work 1. Flexible pipe connectors are specified in the appropriate piping section of these specifications. 2. Seismic control manufacturer shall have the following responsibilities: a. Determine seismic restraint sizes and locations. b. Provide piping and equipment seismic restraints as scheduled or specified. c. Provide installation instructions and drawings. d. Provide calculations to determine restraint loads resulting from seismic forces in accordance with the Local Building Code (see below), governing codes, and project seismic requirements. Seismic calculations shall be certified by a licensed engineer, experienced in the design of restraints for flexibly mounted equipment. 3. Friction from gravity loads shall not be considered resistance to seismic forces. 4. All piping shall to be restrained per NFPA 13. At a minimum, the seismic restraint manufacturer shall provide documentation on maximum restraint spacing for various cable sizes and anchors, as well as 'worst case' reaction loads at restraint locations. Scheduling Discussion: i. Construction dates as listed in the specifications: A. Base Bid and Alternate #3: (1) Begin Project October 7, 2024 (2) Start Construction June 2, 2025 (3) Substantial Completion December 1, 2025 (4) Final Completion December 29, 2025 B. Alternate #1 and Alternate #2: (1) Begin Project October 7, 2024 (2) Start Construction November 11, 2024 (3) Substantial Completion December 1, 2025 (4) Final Completion December 29, 2025 C. Alternate #4, Alternate #5 and Alternate #6: (1) Begin Project October 7, 2024 (2) Start Construction June 2, 2025 (3) Substantial Completion August 1, 2025 (4) Final Completion August 8, 2025 Substitution requests August 30, 2024. HAI will extend a couple days since the Pre-Bid is today.

Bid Results

Educational

$2,465,000.00

Public - City

Addition, Paving, Renovation, Site Work

312

27

66

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
119
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

June 2, 2025

Project location map

1073 E Vine St, Sullivan, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.