Site work, paving, renovation and addition to an educational facility in Sullivan, Missouri. Completed plans call for the addition of a 20,300-square-foot educational facility; and for the renovation of a 178,000-square-foot educational facility.

A. Provide seismic restraints as indicated for each type of equipment and for piping systems. This section applies to Fire Protection Systems. B. Scope of work 1. Flexible pipe connectors are specified in the appropriate piping section of these specifications. 2. Seismic control manufacturer shall have the following responsibilities: a. Determine seismic restraint sizes and locations. b. Provide piping and equipment seismic restraints as scheduled or specified. c. Provide installation instructions and drawings. d. Provide calculations to determine restraint loads resulting from seismic forces in accordance with the Local Building Code (see below), governing codes, and project seismic requirements. Seismic calculations shall be certified by a licensed engineer, experienced in the design of restraints for flexibly mounted equipment. 3. Friction from gravity loads shall not be considered resistance to seismic forces. 4. All piping shall to be restrained per NFPA 13. At a minimum, the seismic restraint manufacturer shall provide documentation on maximum restraint spacing for various cable sizes and anchors, as well as 'worst case' reaction loads at restraint locations. Scheduling Discussion: i. Construction dates as listed in the specifications: A. Base Bid and Alternate #3: (1) Begin Project October 7, 2024 (2) Start Construction June 2, 2025 (3) Substantial Completion December 1, 2025 (4) Final Completion December 29, 2025 B. Alternate #1 and Alternate #2: (1) Begin Project October 7, 2024 (2) Start Construction November 11, 2024 (3) Substantial Completion December 1, 2025 (4) Final Completion December 29, 2025 C. Alternate #4, Alternate #5 and Alternate #6: (1) Begin Project October 7, 2024 (2) Start Construction June 2, 2025 (3) Substantial Completion August 1, 2025 (4) Final Completion August 8, 2025 Substitution requests August 30, 2024. HAI will extend a couple days since the Pre-Bid is today.

Bid Results

Educational

$2,465,000.00

Public - City

Addition, Paving, Renovation, Site Work

312

27

66

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
48
Bidding Soon
878
All Active Projects
339
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

June 2, 2025

img_map_placeholder

1073 E Vine St, Sullivan, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.