Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Renovation of a power facility in Kuttawa, Kentucky. Completed plans call for the renovation of a power facility.

Notice ID- W912P5-25-Q-A035 This is a Service-Disabled Veteran-Owned Small Business Set-Aside for the supply of a replacement HVAC system for the Barkley Power Plant in Kuttawa, Kentucky. The Government intends to award a Firm-Fixed Price supply contract under NAICS Code 333415, which covers Air Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. Award will be made to the lowest priced offeror who is determined to be responsible, and whose quote meets or exceeds the technical specifications and delivery schedule. The contract completion date is 120 calendar days from the date of award. A pre-quote site visit is scheduled for August 27, 2025, at 10:00 AM Central Time, and attendance requires submission of a Security / Site Visit Request form at least three days in advance. Questions regarding the solicitation must be submitted via email by September 2, 2025, at 11:00 AM Central Time. Quotes must be submitted via email and include completed SF 1449, acknowledgment of all amendments, a completed price schedule, and required registration in the System for Award Management (SAM). The apparent successful offeror may be asked to provide banking and past performance references. Contractors must also have a current Basic NIST SP 800-171 DoD Assessment at the time of award. Location: USACE Barkley Power Plant, 8439 US Highway 62 West, Kuttawa, Kentucky 42055 Description Demolition Demolition is the process of tearing apart and removing any feature of a facility together with any related handling and disposal operations. 1.2.1.2 Deconstruction Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials. 1.2.1.3 Demolition Plan Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms. 1.2.1.4 Deconstruction Plan Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms. 1.2.2 Demolition/Deconstruction Plan Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Provide procedures for safe conduct of the work in accordance with EM 385-1-1.

Award

Power Plant

$210,447.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
73
Bidding Soon
976
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 22, 2025

Project location map

8439 US-62, Kuttawa, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.