Renovation of a parking garage in Richmond, Virginia. Completed plans call for the renovation of a parking garage.

Statement of Work General Information The project consists of repairs to the Expressway Parking Garage as shown on the Plans. Work under the Base Bid includes but is not limited to the following per the contract documents: o PATCH PARTIAL DEPTH POST TENSION SLAB REPAIRS o PATCH FULL DEPTH CONCRETE RAMP REPAIRS o OVERHEAD/VERTICAL SURFACE REPAIRS o PLANTER WATERPROOFING REPLACEMENT o BARRIER CABLE REPAIRS o ROUTING AND SEALING OF CONCRETE SLAB CRACKS o EXPANSION JOINT REPLACEMENT o MISCELLANEOUS CMU REPAIRS o STAIR REPAIRS o GROUT POCKETS REPAIRS o CLEAN AND PAINT METALS o ORNAMENTAL CLADDING REPAIRS o NEW BUMPER WALL o SIDEWALK REPAIRS o MEP REPAIRS (BY OTHERS) The successful bidder will be given a contract 'Notice to Proceed' with the following contract schedule performance requirements: (1) an initial 320 consecutive calendar days from NTP for finalizing subcontracts, submittals, ordering critical lead time items (if applicable) and completion of construction as needed to meet substantial (95%) completion requirements, and (2) final (100%) completion of all construction and associated close-out documents within the next 45 consecutive calendar days. Total project contract duration is 365 consecutive calendar days. The Contractor shall provide the following information with their bid: 1. A list of projects of similar size and nature performed over the last five (5) years along with current Owner and Project Architect/Engineer direct contact information for each project. 2. Resumes for key contractor personnel (i.e. Project Manager, Project Superintendent, etc) that demonstrate a minimum of five (5) years experience working on jobs of similar size and nature, including a list of all certified personnel qualified to install the specified system. 3. A summary of project plan and schedule to achieve the substantial and final completion dates specified showing key critical pach activities and completion milestones. 4. The proposed project team including all subcontractors and prime supplier team members. 5. Provide a copy of a detailed Table of Contents of a Contractor Safety Program/Plan used on a similar construction project representing the type of project specific safety program/plan the contractor will prepare and implement for this project. Failure to provide this documentation may result in the bid being deemed non-responsive. The project will be awarded to the contractor whose bid price is the lowest responsive, responsible bid. The City shall employ any resources available to determine the responsible low bidder. Interpretations If any person contemplating submitting a bid for the proposed Work is in doubt as to the true meaning of any part of the proposed Contract Documents or discrepancies of any sort between existing conditions and proposed new Work, he must submit a written request for an interpretation to the Department of Procurement Services, 900 E. Broad Street Room 1104, Richmond, Virginia 23219. The person submitting the request shall be responsible for its prompt and actual delivery by Wednesday, September 18, 2024 5:00 pm. Such documents may emailed to Trina Berry at trina.berry@rva.gov. Any interpretation or modification of such documents will be made only by Addendum duly issued by the Owner and a copy of which will be mailed or delivered to each bidder known to have received a set of such documents. Neither the Owner nor the Architect or Engineer will be responsible for any other explanations or interpretations anyone presumes to make on behalf of the Owner or Architect or Engineer before the expiration of the ultimate time set for the receipt of bids. Any contact with any City officer, employee, agent or other representative concerning this Invitation for Bids prior to award and execution of the Contract other than that outlined in this section "Interpretations" is prohibited. Any such unauthorized contact may disqualify the bidder from this procurement. Withdrawal of Bids Conditions for Withdrawal Before Deadline for Receipt. A bidder may withdraw the bidder's bid before the deadline fixed in this Invitation for Bids for the receipt of bids by submitting a written notice to the person identified on the cover sheet of the Invitation for Bids as the preparer of the Invitation for Bids. The written notice must be signed by the person who signed the bid, provided that another person may sign the written notice instead if a valid power of attorney authorizing such other person to sign on behalf of the person who signed the bid is attached to the written notice. After Deadline for Receipt. A bidder may withdraw the bidder's bid after the deadline fixed in this Invitation for Bids for the receipt of bids only in accordance with section 21-53 of the Code of the City of Richmond and the provisions of this section 2.3.5. Pursuant to section 21-53(a) of the Code of the City of Richmond, a bidder for a public construction contract, other than a contract for construction or maintenance of public highways, may withdraw his bid from consideration if the price bid was substantially lower than the other bids due solely to a mistake in the bid, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of a bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the bid sought to be withdrawn. Pursuant to section 21-53(b) of the Code of the City of Richmond, if a bid contains both clerical and judgment mistakes, a bidder may withdraw his bid from consideration if the price bid would have been substantially lower than the other bids due solely to the clerical mistake that was an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of a bid that shall be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the bid sought to be withdrawn. Procedure for Withdrawal due to Error or Mistake. Bids will be opened on the date and at the time fixed in the Invitation for Bids, as amended by any addendum. Bids are usually opened one day following the deadline for the receipt of bids fixed in the Invitation for Bids, as amended by any addendum. Bids will not be opened less than one day following the deadline for the receipt of bids fixed in the Invitation for Bids, as amended by any addendum. In accordance with section 21-53(c)(2) of the Code of the City of Richmond, the bidder shall submit to the person identified on the cover sheet of the Invitation for Bids as the preparer of the Invitation for Bids the bidder's original work papers, documents and materials used in the preparation of the bid at or prior to the time fixed for the opening of bids. The work papers shall be delivered by the bidder in person or by registered mail. The bidder shall have two hours after the opening of bids within which to claim in writing any mistake as defined in this section 3.6 and withdraw the bid. The Contract shall not be awarded by the City until the two-hour period has elapsed. Under these procedures, the mistake shall be proved only from the original work papers, documents and materials delivered as required in this section 2.3.5. The work papers, documents and materials submitted by the bidder shall, at the bidder's request, be considered trade secrets or proprietary information subject to the conditions of section 21-5(f) of the Code of the City of Richmond. The failure of a bidder to submit the bidder's original work papers, documents and materials used in the preparation of the bidder's bid at or prior to the time fixed for the opening of bids constitutes a waiver by the bidder of the bidder's right to withdraw the bidder's bid due to an error or mistake. Pursuant to section 21-53(e) of the Code of the City of Richmond, no bid shall be withdrawn under this section when the result would be the awarding of the Contract on another bid of the same bidder or of another bidder in which the ownership of the withdrawing bidder is more than five percent. Pursuant to section 21-53(f) of the Code of the City of Richmond, if a bid is withdrawn in accordance with this section 2.3.5, the lowest remaining bid shall be deemed to be the low bid. Pursuant to section 21-53(g) of the Code of the City of Richmond, no bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person to whom the Contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted. The person or firm to whom the Contract was awarded and the withdrawing bidder are jointly liable to the Owner in an amount equal to any compensation paid to or for the benefit of the withdrawing bidder. Pursuant to section 21-53(h) of the Code of the City of Richmond, the Director of Procurement Services shall notify the bidder in writing within five business days of the Director's decision regarding the bidder's request to withdraw the bidder's bid. If the Director of Procurement Services denies the withdrawal of a bid under the provisions of this section 2.3.5, the Director of Procurement Services shall state in such notice the reasons for the decision and award the Contract to such bidder at the bid price, provided such bidder is a responsible and responsive bidder. At the same time that the notice is provided, the Director of Procurement Services shall return all work papers and copies thereof that have been submitted by the bidder. Consequence if Bid Not Withdrawn. If the bidder does not withdraw the bidder's bid as provided in this section 2.3.5, or if the bidder is not permitted to withdraw the bidder's bid as described in section 3.6.2(G), the Owner shall not be liable for any costs associated with mistakes or errors in the bid, and in no event may the amount of the Contract, without adequate consideration, be increased for any purpose, including, but not limited to, relief of the bidder from the consequences of an error in the bidder's bid or offer. Bidders Present At the time and place fixed for the opening of the bids, the contents of the bids will be read aloud and made public information for bidders and others properly interested who may be present either in person or by representative. Bid tabulations will be available on the website the Monday following the date set for the opening of bids. Otherwise access to public information shall be in accordance with 21-5 of the Code of the City of Richmond. Addenda From time to time, addenda may be issued that will provide clarifications or supplemental information about the bid documents. Failure to acknowledge any addendum that has a material effect on the bid: that is on price, quantity, quality or delivery, and is not merely administrative may result in your bid being rejected as non-responsive. Addenda must be acknowledged as indicated in the Invitation for Bids. The bidder is responsible for verifying the existence of addenda items. Regulations Governing Contractors Bidders are required under Title 54.1, Code of Virginia, to show evidence of licensing as appropriate before bid may be received and considered on a general or Subcontract as follows: "Class A Contractors" perform or manage construction, removal, repair, or improvements when (i) the total value referred to in a single contract or project is $70,000 or more, or (ii) the total value of all such construction, removal, repair, or improvements undertaken by such person within any twelve-month period is $500,000 or more. "Class B Contractors" perform or manage construction, removal, repair, or improvements when (i) the total value referred to in a single contract or project is $7,500 or more, but less than $70,000, or (ii) the total value of all such construction, removal, repair or improvements undertaken by such person within any twelve-month period is $150,000 or more, but less than $500,000. "Class C Contractors" perform or manage construction, removal, repair, or improvements when (i) the total value referred to in a single contract or project is over $1,000 but less than $7,500, or (ii) the total value of all such construction, removal, repair, or improvements undertaken by such person within any twelve-month period is less than$150,000. The Board shall require a master tradesmen license as a condition of licensure for electrical, plumbing and heating, ventilation and air conditioning contractors. "Contractor" means any person, that for a fixed price, commission, fee, or percentage undertakes to bid upon, or accepts, or offers to accept, orders or contracts for performing, managing, or superintending in whole or in part, the construction, removal, repair or improvement of any building or structure permanently annexed to real property owned, controlled, or leased by him or another person or any other improvements to such real property. Laws, Permits and Regulations The Contractor must comply with all local, State and Federal laws, rules, ordinances and regulations applicable to the Contract and to the Work done hereunder, and must obtain at its own expense all permits, licenses or other authorization(s) necessary for the prosecution of the Work. If the Contractor ascertains at any time that any provisions of this Contract are not in compliance with applicable laws, rules, ordinances or regulations, it shall promptly notify the Architect or Engineer and confirm the findings in writing. Building Permit. The Contractor will apply for and pay for a building permit and complete all necessary forms (unless otherwise notified). (Contractor to apply and pay for all other permits also). Minority Business Utilization It shall be the official policy of the City of Richmond to increase the number of minorities who participate meaningfully in all City construction contracts. To this end, the City shall use good faith efforts and shall encourage good faith efforts by all parties who engage in governmental construction contracting with the City to the following ends: To stimulate the creation and development of minority contractors and subcontractors, and to advance in reasonable and responsible ways, and deliberately and consistently over the long term, their entrance into and participation in the construction industry. To advance in reasonable and responsible ways, and deliberately and consistently over the long term, the participation of minority individuals at higher skill and responsibility levels within non-minority firms engaged in construction contracting and subcontracting. To encourage voluntary efforts by the construction industry to increase the participation of minority individuals and businesses in the industry. All actions taken by the City in construction contract procurement shall be consistent with this policy. Examination of Plans, Specifications, Contract Documents and Project Site By submitting a bid, the bidder represents that it has visited the site of the proposed Work; is fully acquainted with conditions relating to the proposed construction; has correlated its observations with the requirements of the Contract Documents and all matters which may in any way affect the Work or its performance. The Contractor fully understands the extent of the Work required by the Contract Documents as a result of such examination and investigation. The failure or omission of any bidder to review or examine any form, instrument, addendum or other document, or to visit the site and become acquainted with existing conditions, shall not relieve the bidder from any or all obligations with respect to its bid or the Contract. The submission of a bid shall be taken as a prima facie evidence of compliance with this paragraph and no plea of ignorance or misunderstanding as to what is anticipated under the terms of the bid or the Contract Documents shall be available as a defense for failure to perform. Further, by submitting a bid for this project the Contractor certifies that all his Subcontractors are familiar with the Contract Documents as they may affect each Subcontractor. The Contractor further agrees that it is as fully responsible to the Owner for the acts or omissions of its Subcontractor, either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. Supplemental Specifications Special provisions applicable to the project may be used to supplement or clarify these General Conditions, but no item of the General Conditions may be amended nor deleted, or its intent changed without prior written approval of the Owner. Subsurface Investigation Subsurface investigation data indicated on the drawings or incorporated in the specifications are intended by the Owner as a guide to acquaint the bidder with conditions that may be encountered during the course of Work. The Owner does not guarantee these conditions are representative of the entire project. The bidder may make, at its own expense, sufficient investigations necessary to verify the quantities and materials that may be encountered. Trade Names and Alternatives When the drawings or specifications specify one or more manufacturers' brand names or makes of materials, devices or equipment as indicating a quality style, appearance or performance, the bidder shall base its bid on any of the specified brands or an alternate brand which is intended as a substitute. Use of an alternate shall not be permitted unless it is found to be equal or better and approved by the Architect or Engineer and at no additional cost to the Owner. The Bidder shall determine and certify that any substitute will fit in the space provided so that it will be accessible for maintenance and that it shall produce the capacity specified. Burden of Proof. The burden of proof as to the comparative quality and suitability of alternative equipment, articles or materials shall be upon the bidder who shall furnish at his or her own expense such information relating thereto as may be required by the Architect or Engineer. The Architect or Engineer shall be the sole judge as to comparative quality and suitability of alternative equipment, articles or materials and whose decisions shall be final. Any other brand, make of material, device or equipment which, in the opinion of the Architect or Engineer is recognized the equal of that specified, considering quality, workmanship and economy of operation and maintenance, and is suitable for the purpose intended, may be accepted. Substitution. Substitution of equipment, articles or materials for specified items or approved alternates after bid opening may not be made without the prior written approval of the Architect or Engineer. Contractor's Insurance Builder's Risk Insurance. Contractor's or Builder's Risk Insurance in the all-risk form shall be provided by the Contractor to the extent of 100 percent of the bid on which the Contract is awarded to the Contractor covering damage to or loss of work performed under the Contract caused by fire, explosion, wind, lightning, vandalism, malicious mischief and any similar other casualty, risk or peril. The insurance shall be payable to the Owner and Contractor as their respective interests may appear. THIS PARAGRAPH NOT APPLICABLE TO SEWER, STREETS AND UNDERGROUND UTILITIES PROJECTS. Blasting Insurance. Should any blasting become necessary to perform the Contract, liability insurance shall be provided by the Contractor in the amount of at least $1,000,000 per occurrence, directly or indirectly arising from or during the time blasting is done. Such insurance may be provided either under a separate blasting insurance contract, by endorsement of the Commercial General Liability Insurance contract, or by any other insurance contract. Such insurance shall cover the General Contractor and shall extend to provide coverage of any Subcontractor doing blasting. No blasting shall be done until the insurance covering blasting is provided as required by this section 2.3.15 or in greater amounts if so required by the Owner, provided, however, that in the event the blasting is solely and exclusively to be carried out by and under the supervision and direction of a Subcontractor's policy. The furnishing of insurance by the Subcontractor shall not create any contractual relationship between the Owner and Subcontractor. If the Owner requires greater amounts of insurance, notice of such requirements shall be given to all bidders not less than fifteen (15) days prior to the bid receipt date. Insurance Required of Subcontractors. The Contractor shall not allow any Subcontractor to commence work on his subcontract until insurance as specified herein has been obtained covering the operations of said Subcontractor. Non-Release of Obligations. The carrying by the Contractor or Subcontractor of the insurance required shall in no way be interpreted as relieving the Contractor or Subcontractor of any obligations it may have under this Contract. Bid Security Any bidder submitting a bid for a construction Contracts in excess of $100,000 shall submit to the City a bid guarantee of not less than five percent (5%) of the bid amount set forth in item 14 of the Bid Form. Such security may be a certified check or a cashier's check or a Bid Bond made payable to the Owner. The Owner may require bidders submit bid security for lesser bid amounts, however, this will be so stated in the Invitation for Bid. Such Bid Bond or check shall be delivered, on or before the due date for this Invitation for Bids, to the City's Department of Procurement Services, 900 E. Broad Street, Room 1104, Richmond, Virginia 23219, in an envelope marked with a reference to this Invitation for Bids by number and the bidder's name. The bidder shall deliver such Bid Bond or check with the understanding it shall guarantee that the bidder will not withdraw its bid during the acceptance period indicated in the Invitation for Bids except as defined in paragraphs 2.42 and 3.1 of the Contract Documents; that if the bid is accepted, the bidder will enter into a formal Contract with the Owner in accordance with the Contract Documents; and that Performance and Payment Bond, and Certificate of Insurance will be given; and that in the event of the failure to enter into said Contract and give said Bonds and Certificate of Insurance within fifteen(15) days after it has received notice of acceptance of its bid, the bidder shall be liable to the Owner for the full amount of the bid guarantee or the difference between the bid for which the bond was written and the next low bid as representing the damage to the Owner. Forfeiture under a Bid Bond shall not exceed the lesser thereof. The Bid Bonds and checks shall be returned to all except the three lowest bidders after the formal opening of bids. The remaining bid bonds and checks will be returned to the three lowest bidders after the accepted bidder has executed the Contract, Performance and Payment Bonds and Certificate of Insurance and the Owner has approved them. If the required contract has not been executed within sixty (60) days after the date of the opening of bids, or any extension agreed to in writing by both parties, then bond or check of any bidder will be returned upon request, provided it has not been notified of the acceptance of its bid prior to the date of such request. No plea of mistake in the bid shall be available to the bidder for the recovering of a bid security or as a defense to any action based upon the neglect or refusal to execute a Contract except as provided in paragraphs 2.27 and 3.5 of the Contract Documents. A bid bond will be accepted if executed on the official form furnished by the Owner or other form as may be approved by the Owner. Bid bonds must be in an original form and contain original signatures. Any bid accompanied by a bond executed as a copy, duplicated or facsimile will be rejected. Preparation and Submission of Bids All unit or lump prices shall be shown in numbers and written characters. Where discrepancies occur between the numbers and written, the numbers shall govern. Bidders shall bid on all items as shown on the bid sheet, if required by the Owner. Bids by partnerships must furnish the full name of all partners and must be signed in the partnership name by one of the members of the partnership. Bids by corporations must be signed with the legal name of the corporation followed by the name of the state in which they are incorporated and by the signature and designation of the president, secretary, or other person authorized to bind it in the matter. A bid by a person who affixes to his or her signature the word "President", "Secretary", "Agent", or other designation, without disclosing his or her principal, may be held to be the bid of the individual signing. Satisfactory evidence of the authority of the officer signing on behalf of the corporation shall be furnished if signed by other than the president. Bidders are required under Title 54.1 of the Code of Virginia to show evidence of licensing as a Class "A" Contractor before bid may be received and considered (1) on a general or subcontract of $70,000 or more, or (2) Class "B" Contractor for projects of $7500 to $70,000, and (3) repair or improvements undertaken by such person within any twelve-month period is Five Hundred Thousand dollars ($500,000) or more. Receipt and Opening of Bids Bids will be opened publicly at the date and time stated in the Invitation for Bid. The officer whose duty it is to open them will decide when the specified time has arrived. It is the responsibility of the bidder to assure that its bid is submitted prior to the time set for the receipt of bids. Any bid received after the time designated for receipt of bids will not be considered. Minor Irregularities The Owner reserves the right to waive minor informalities and irregularities. A minor informality or irregularity is one that is merely a matter of form and not of substance or some immaterial defect in a bid or variation of a bid form that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on price, quantity, quality or delivery is negligible. Rejection of Bids The Owner reserves the right to reject any or all bids. Any bid that fails to conform to the essential requirements of the solicitation or the specification or is unreasonable as to price may be rejected. In cases of unit priced bids, any bid may be rejected if the prices for any line items or sub line items are materially unbalanced. Royalties and Patents Contract prices must include all royalties and costs arising from patents, trademarks, and copyrights in any way involved in the Work. Whenever the Contractor is required or desires to use any design, device, material or process covered by letters, patent or copyright, the Contractor shall indemnify and save harmless the Owner, its officers, agents and employees from any and all claims for infringement by reason of the use of any such patented design, device, tool, material, equipment or process to be performed under the Contract, and shall indemnify the said Owner, its officers, agents, and employees for any costs, expenses and damages which it may be obliged to pay, by reason of any such infringement, at any time during the prosecution of, or after completion of the project. Question Deadline 09/22/2024 Questions concerning requirements must be brought to the attention of the Contracting Officer responsible for this solicitation at least ten business days prior to the solicitation closing date. Bid Results:- Part A Eastern Waterproofing & Restoration of Virginia, LLC $414,065 Part B Richmond Primoid, Inc $117,500

Bid Results

Parking Garage

$531,565.00

Public - City

Renovation

30

18

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
33
Bidding Soon
839
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

December 16, 2024

img_map_placeholder

901 E Canal St, Richmond, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.