BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Winnipeg, Manitoba. Completed plans call for the renovation of a fire / police facility.

The Work to be done under the Contract shall consist of supply and installation of new three Cooling Units in Winnipeg Police Service Headquarters 5th Floor Server Room as per drawings and specifications. The major components of the Work are as follows: (a) Supply and Installation of three (3) new free-standing Indoor Air Conditioning Units in the 5th Floor Server Room. (b) Supply and Installation of new Rooftop Condensing Unit and associated piping (c) Modify existing plumbing system to accommodate new AC Units. (d) Modify existing electrical system to accommodate new AC Units. The funds available for this contract are $550,000.00. A Performance Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to These Supplemental Conditions (Form H1: Performance Bond), in the Amount of Fifty Percent (50%) of the Contract Price; and (B) a Labour and Material Payment Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to These Supplemental Conditions (Form H2: Labour and Material Payment Bond), in an Amount Equal to Fifty Percent (50%) of the Contract Price Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. If the Bidder finds errors, discrepancies or omissions in the Tender, or is unsure of the meaning or intent of any provision therein, the Bidder shall notify the Contract Administrator of the error, discrepancy or omission, or request a clarification as to the meaning or intent of the provision at least five (5) Business Days prior to the Submission Deadline.

Bid Results

Fire / Police

$797,533.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
10
Bidding Soon
221
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

December 6, 2024

img_map_placeholder

245 Smith St, Winnipeg, MB


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.